Title Page
-
Date
-
Name
-
By signing this, you confirm all hazards have been identified and controls are in place and the persons listed on this document have been informed of these hazards and controls.
-
Location
-
Case number
Worksite Hazard Rating
-
Estimated vehicles per day
-
Permanent Traffic Speed (Kph)
-
Worksite Traffic Speed (Kph)
-
Risk Rating
-
Clearance between workers & traffic (metres)
-
Which Temporary Guidance Scheme (TGS) is being used?
-
Please upload photo of TGS being used
-
Please upload photo of Mud Map
Traffic Management Checklist
Planning
-
Has a traffic management plan been selected or provided?
-
Is plan available for inspection?
-
Is plan relevant for the work?
-
Are written authorisations for temporary roadwork speed limits required/in order?
-
Are documented changes to traffic management plans available for inspection?
-
Have temporary roadwork speed limits been determined correctly?
Advance Warning / SIgnage
-
Are all roadwork signs and devices installed according to the Traffic management plan?
-
Have any contradictory, distracting or superfluous signs or markings been covered up or removed?
-
Are signs appropriate for current conditions? i.e. symbolic worker visible?
-
Is signage suitably placed, especially for vehicles approaching at high speed?
-
Are multi message signs being used correctly?
-
Are signs free from damage and defect?
-
Are sign mountings secure, stable and not a hazard to road users if struck?
-
Are signs in pairs (gated) where needed?
-
Are flashing arrow signs available and in use where required?
-
Are sign sizes correct?
Worksite
-
Are all Traffic Control personnel wearing safety helmets, safety eyewear and other required PPE?
-
Are all Traffic Control personnel wearing high visibility clothing appropriate to conditions and worn correctly?
-
Are clearances between workers and adjacent traffic maintained?
Other Road Users
-
Has possible traffic congestion been considered and steps taken to avoid it?
-
Have the effects of the works on public transport been considered?
-
Have the needs of other road users been provided for?
-
Has proper access to side roads and properties been provided?
Traffic Personnel
- Traffic personnel (In addition to person completing JSEA)
-
By signing this, you acknowledge you have read, understand and will comply with this document.
Additional site personnel
-
By signing this, you acknowledge you have read, understand and will comply with this document.
Site Photos (optional)
- Site Photos (Optional)
-
Site photo