Information
-
Document No.
-
Audit Title
-
Client/Site
-
Conducted on
-
Prepared by
-
Location
-
Please select Crew Leader, or
- James Bell
- Justin Bretherton
- James Pearton
- Paul O'Shannessy
- Mark Pfister
- Greg Bretherton
- Darren Evans
- Ben Warren
- Rod Allen
- Luke Rose
- Alessandro De Gregorio
- Dale Byrne
- Luke Bryant
- Darren Smart
- Conor Sharvin
- Marc Tasker
- Rhys Owen
- Andrew Jackson
- Michael Gritzalis
- Luke McCrea
- Ross Charlesworth
- Adam White
- David Surace
- David Wayne O'Neil
- Ian Divers
- Jason Griffith
- Keith Warren
- Mariah Marshall
- Mark Ferrari
- Michael Chisholm (Leakage)
- Nathan Webb
- Nicholas Deluca
- Paul Seyffer
- Sam Sanfilippo
- Shane Barclay (Pipeline Patrol)
- Shane Duggin
- Wesley Crocker
-
Contractor
- Wilgaz
- Adam Bartle
- Melbore Construction
- Simpkin Services
- South Valley Trenching
- Southern Cross Construction
- Telgas
- Uda & Sons
- Allgas Plumbing
- Beach Front Gas
- Crough Gas & Plumbing
- Cardinia Heating & Plumbing
- D.A. Plumbing & Gasfitting
- D&L Scott Plumbing
- DJ Crough Plumbing
- Eleventh Julwood
- Gasplumb
- Grays Plumbing & Gasfitting
- JC Gas & Plumbing
- Mahon Plumbing
- MET Gas
- MG Consulting
- RJS Gas Services
- Shaunara Nominees
- Specialised Gas Services
- BWB Constructions
- G & G Twin Excavations
- MEX
- MR Utilities
- RAM Boring
- Accelerated
- Aranmore (No Project Work)
- Covcrete
- R & A Excavations
- TAG
- AADD
- Ausconnect
- Australian Horizontal Drilling (No Project Work)
- Construct
- Altus
- Holemasters
- Hoogweld
- Reliable Pipe
- Steve Marshall Contracting
- JDC
- KPS
- Prestige Paving
- Roadsafe Asphalt
-
Please enter the job's Mat. Code (for eg QAD, QBF, QBW, QAG ...)
1. Site Risk Management
-
Are relevant SWMS available and a Site Risk Assessment (JSEA) been completed?
-
Have all personnel, sub-contractors and site visitors been inducted onto the site and signed onto the JSEA?
-
Has the JSEA identified site specific Safety and Environmental risks?
-
Are all identified risk control measures on SWMS and JSEA in place?
-
Has the Traffic / Pedestrian Management Plan been identified / created and available on site and documented on the JSEA?
2. Environment & Hazardous Goods
-
If pipe bedding material and quarry product/s are stored onsite, have they been placed in a suitable location?
-
Are there effective erosion, sediment controls and / or silt traps in place?
-
Are there any chemicals in use and is there a current MSDS available for the chemical?
-
Are hazardous materials and dangerous goods separately stored and labelled?
-
Is refuelling of equipment in line with EMP section 14.11d?
-
Are there any control measures to manage spills and leaks? (ie.spill kit)
-
Have Amenity trees been adequately protected during works (ie. no signs of damage)?
-
Has due care and attention been given to excavations beneath the drip lines of any trees?
-
Is material containing Asbestos treated as per EMP and VWCA 2007 OHS regulations?
-
Has waste been segregated for reuse / recycle / disposal as per EMP section 14.10?
-
Is Waste Water treated and disposed of as per EMP section 14.9? (e.g. Syphon, Trench, Pit water)
-
Is Mains dust disposed of as per EMP section 14.3?
-
Has flora, fauna and culture heritage issues been identified and controlled as per EMP section 14.4?
3. Skills and Competency
-
Do all personnel have MG Passports on site?
-
Is all training and are all authorisations current for the functional role of the Passport holder?
-
Are all personnel trained licensed / registered for their functional role?
4. Forms/Documentation
-
Is an ipad available onsite and can personnel find relevant documents within?
-
Does the job file contain a daily job sheet / work instruction?
-
Does the job file contain current Dial before You Dig information?
-
Does the job file contain a sequence of operations?
-
Does the job file contain design drawings?
-
Are up to date district plans on site?
-
Are the latest MG Standard Work Procedures (SWP) and Engineering standards available onsite?
-
Is a Pipelines work permit required and are there any restrictions?
-
Is a Pipeline Inspector on site (if required)?
-
Is a hot work permit required and are there any hot work restrictions?
-
Is a Confined Space permit required and are crew members involved in CSE signed onto the permit?
-
Is a Road Opening Permit required and is it on site?
-
Has notice of intention to excavate been submitted to Worksafe?
5. Traffic and Pedestrian Management
-
Has the appropriate Traffic and Pedestrian Management Plan been identified, and does it meet all requirements?
-
Does the actual traffic / pedestrian layout reflect the Traffic / Pedestrian Management Plan?
-
Is pedestrian traffic safely controlled through the worksite?
-
Are traffic signs and devices legible and undamaged?
-
Are suitable barriers provided to protect the public from the work site?
-
Where site is to be left overnight, are adequate protection measures, lighting and night guidance provided?
6. Personnel Protective Equipment
-
Is PPE in accordance with Comdain requirements and task specific PPE worn as per MG U PR 0006 as a minimum?
-
Is required PPE within inspection or replacement dates and in good condition?
-
Is other appropriate PPE utilised as required and in good condition? (e.g. Harness, Life lines etc.)
7. Vehicles/Plant
-
Are all plant operators licensed as required?
-
Have pre-start checklists been completed?
-
Are all vehicles/plant within their service range?
-
Are all vehicles/plant in acceptable condition, in terms of cleanliness, and is appropriate MG branding visible?
8. First Aid
-
Is there an intact First Aid kit and are contents in good condition & within expiry dates?
-
Is the kits location marked on the vehicle?
9. Tools and Equipment: Testing and Condition
-
Is fire extinguisher charged and within test dates?
-
Are all electrical items tagged and within their test date range?
-
Is Poly Fusion equipment within the 6 month calibration cycle, gauges and teflon plates in good condition?
-
Is the gas detector calibration within the stipulated date/s (as per MG Eng Std EC-DD-4142) and stored appropriately to prevent damage?
-
Are Data Logger gauges within calibration date and stored appropriately to prevent damage?
-
Is the voltage tester fit for purpose and tested prior to use?
-
Is Washington pressure tester in good condition and stored appropriately to prevent damage?
-
Is Oxy acetylene equipment in good condition and within test date? (AS 4839 section 8)
-
Are the gas bottles within expiry date and stored appropriately?
-
Is lifting equipment in good condition and within test date?
-
Is the percussion bar and mat in good condition and within test date?
10. Worksite/Work Practices
-
Are there an appropriate number of trained and competent crew members on site for task?
-
Are Effective Safety Observers in place?
-
Are No-Go Zones being adhered to?
-
Has pipework been tested for stray current?
-
Are cross bonding leads required and used?
-
Are the appropriate numbers of fire extinguisher/s on site and placed in appropriate locations?
-
Is Plant and equipment appropriately set up?
-
Have other authority assets been located and / or exposed by hand prior to mechanical excavation?
-
Are all gas grid materials approved by Multinet?
-
Are all gas grid materials and pipe stored to prevent damage or deterioration (refer MG Eng Std ES DD 4081)?
-
Are jointing techniques in line with MG SWPs?
-
Have MG standards (including covers, clearances, offsets and bedding materials) been maintained?
-
Are stop off of Mains and Services methods in line with MG SWPs?
-
Is the site tidy with no obvious tripping or other hazards?
-
Are trenches appropriately benched, battered or shored?
-
Is spoil placed in excess of 0.5 from excavation wall?
-
Is a ladder or steps used to access excavation?
-
Is confined space rescue equipment on site and set up as required?
-
Are pits / man holes protected to prevent falls?
-
Is Sleeve / Slabbing / tape protection in place?
-
Has pressure testing and purging been conducted in line with MG SWPs?
-
If required, was a red card left with correct information and details?
-
Are valve covers, pits etc. appropriately installed and level?
11. Facilities & Compounds
-
Is crush rock laid, level and compacted?
-
Is there any evidence of subsidence in compound and around entry exit points?
-
Is the interior of compound clear of fire hazards and tidy?
-
Is the exterior of compound clear of fire hazards and tidy?
-
Is fire protection in place? Are fire extinguishers in place and within test dates?
-
Is there acceptable security of compound fence and gates?
-
Is there paint work on buildings, posts and bollards etc.?
-
Are warning signs and emergency contact details in place with current information?
-
Are PPE signs in place?