Information
-
Audit Title
-
Document No.
-
Client / Site
-
Prepared by
-
Date
-
Trane is committed to a successful project and our ultimate goal a satisfied customer. In order for us to minimize trouble shooting and additional job costs it is imperative that the following checklist items that pertain to this mechanical system be completed. This pre-startup check list will serve as document to the progress of the job with relationship to the equipment and controls prior to Trane doing the commissioning of the controls system.
When Trane is notified that the mechanical system is ready for commissioning of the controls, it is assumed that the mechanical equipment is ready to run. If there are circumstances that the equipment is not ready to operate, the Trane technician(s) along with the Trane project manager will determine if there is enough work to begin or if they will need to be rescheduled which may have an impact on the completion date. This may also result in extra costs if travel is involved. Please note that Trane will make every effort to work with your company to complete the job at the time requested but will realistically need the number of days to do our work as previously discussed with your company.
Date and time of visit
-
Select date
Outdoor Conditions
Safety Concerns
-
Any safety issues?
Type of Mechanical Equipment Controlled and to be Commissioned by Trane
-
- AHU's with VAV & FPB's
- RTU's with VAV & FPB's
- Water Source Heat Pumps
Work In Progress / Mechanical, Electrical, Controls.
-
Enter work description:
-
Add media
RTU's with VAV & FPB's
-
RTU(s) Have Been Started by Factory Qualified Representative or Service Department
-
VFD(s) Ready to Operate
-
DX on RTU(s) Can Operate For Commissioning
-
Gas Heat on RTU Has Been Started, Valves Open and Ready to Operate for Commissioning.
-
Chilled Water is Available to RTU(s) for Commissioning?
-
Hot Water Available to RTU(s) for Commissioning?
-
Has All the Field Installed Devices That Came With RTU Installed and Wired?
Fan Powered Boxes & VAV Boxes
-
Power Available and Disconnects Are On At FPB's?
-
Power Available For Electric Duct Heater For VAV Boxes?
-
Hot Water Available to VAV / FPB's For Commissioning?
-
Hand valves are open at the reheat coils of the VAV / FPB's
Humidifier
-
Have the humidifier(s) been tested and ready to operate?
Field Observations and Discussion
-
Observations and Discussions
-
Add media
Copies to:
-
Email