Trane is committed to a successful project and our ultimate goal a satisfied customer. In order for us to minimize trouble shooting and additional job costs it is imperative that the following checklist items that pertain to this mechanical system be completed. This pre-startup check list will serve as document to the progress of the job with relationship to the equipment and controls prior to Trane doing the commissioning of the controls system.
When Trane is notified that the mechanical system is ready for commissioning of the controls, it is assumed that the mechanical equipment is ready to run. If there are circumstances that the equipment is not ready to operate, the Trane technician(s) along with the Trane project manager will determine if there is enough work to begin or if they will need to be rescheduled which may have an impact on the completion date. This may also result in extra costs if travel is involved. Please note that Trane will make every effort to work with your company to complete the job at the time requested but will realistically need the number of days to do our work as previously discussed with your company.
Date and time of visit
-
Select date
Outdoor Conditions
Safety Concerns
-
Any safety issues?
Type of Mechanical Equipment Controlled and to be Commissioned by Trane
-
- AHU's with VAV & FPB's
- RTU's with VAV & FPB's
- Water Source Heat Pumps
Work In Progress / Mechanical, Electrical, Controls.
-
Enter work description:
-
Add media
Heat Pump Loop Circuit
-
Loop Pumps Are Ready To Operate
-
VFD's Have Been Started By Factory Representative and Can Operate In Auto.
-
Flushing of Lines Has Been Completed?
-
Boiler(s) Have Been Started and Ready to Run for Heat Injection
-
Cooling Tower(s) are Filled, Fans and Pumps are Ready to Run
-
Geothermal Loop is Ready, Pumps are Ready to Run.
Heat Pumps
-
Heat Pumps Have Been Started and Ready to Operate Automatically.
-
Breakers and Disconnects are Turned on at Heat Pumps
-
All Hand Valves are Open at Heat Pumps?
Energy Recovery Units
-
All ERU's Have Been Started and Ready to Operate?
-
IP Addresses Have Been Programmed Into ERU(s) by Factory Startup Rep?
Field Observations and Discussion
-
Observations and Discussions
-
Add media
Copies to:
-