Information
-
Customer address
-
Scopers name
-
Job ID
-
Service Order Number
-
Job Number
-
Actual RFS date
-
ONT Serial Number
Civil
Civil
-
Is civil work required?
-
No civil work required
-
Civil pictures
-
Specific civil work requirements
- Tar seal/concrete cutting
- Use telco duct
- Other
-
'Other' specifics here
-
Services located near proposed route
- Power
- Gas
- Water
- Telco
- Sewerage
- Drainage/Stormwater
-
Are there any noteable obstacles/difficulties?
-
Noteable obstacles/difficulties information
-
Civil job overview
-
Does this job require ROW consent?
-
Is this, or has this job been put on hold?
Aerial
Aerial
-
Is aerial work required?
-
Aerial work not required.
-
Aerial pictures
-
Specific aerial work requirements
- ADSS Span(s)
- ADSS via underground duct
- Install equipment
- Air blown fibre to FAT
-
Is traffic management required?
-
Traffic management details
-
Equipment to install
-
Aerial job overview
-
Aerial tresspass consent required
-
Is this, or has this job been put on hold?
Tech
Technical Install
-
Is tech install required?
-
Tech complete/Not necessary.
-
Tech pictures
-
Tech to install from:
-
Tech to install to:
-
Mode of install:
- Through roof space
- Under floor
- Via existing infrasructure
- Surface/exposed
- Back to back install
-
Surface/exposed tubing/wiring details
-
Existing infrastructure details
-
Extra materials required: (ETP-ITP w/LSZH & 2core ABF considered standard)
- Conduit
- Capping
- Indoor/outdoor
- 2 core flat LSZH
- 12 Core fibre
- FAT
- Other
-
Type of FAT required
-
Other materials details
-
Additional work:
-
Details
-
Details
-
Details
-
Tech install overview