Information
-
Conducted on
-
Audit Site
-
Traymakers Contractor
-
Location
-
Prepared by
-
Personnel
-
Photo of site
Introduction
-
Description of traymaking area - specify number of machines, type of machines and layout
-
Description of access to traymaking area
-
Photo of traymaking area
1.0 Traffic Management
-
1.1 Traffic Management has been assessed and TMP controls have been established and being followed
-
1.2 Is there adequate distance between pedestrian and forklift interaction
-
1.3 TMP being adhered to ie barriers in place, forklift interaction beimg managed
-
1.4 Are there designated traffic speeds through the area (specify)
-
1.5 Pedestrian pathways are protected and/or re-directed from potential interface with site traffic
2.0 Risk Management
-
2.1 Walkways clear of trip hazards (extension cords and pallets)
-
2.2 Are there extension cords on the ground in work area
-
2.3 Are fans clean, free of dust and in good condition (check guarding and cords)
-
2.4 Can operators reach empty pallet heights?
-
2.5 Are pallet stacks and product stable?
-
2.6 Is there excess hot melt pallets or hot melt debris on the ground?
3.0 - Compliance
-
3.1 Is the quick reference SOP displayed on machines
-
3.2 Is there adequate signage on the machine eg hot melt warning, machine hazards
-
3.3 Is signage legible (eg worn or faded)
-
3.4 Is PPE worn (specify)
-
3.5 Training and competency register available
-
3.6 Are training records available
4.0 Tools and Equipment
-
4.1 Is there a tool register for each machine?
-
4.2 Have all electrical leads been tested and tagged
-
4.3 Are all tools not in use stored correctly?
-
4.4 Are cutting tools used (specify)
5.0 Housekeeping
-
5.1 Is the work area clean and tidy
6.0 Documentation
-
6.1 Packaging machine and operator manual, hazard register, SOPs and MSDS available on the machine
-
6.2 Emergency procedures clesr and visible
-
6.3 Are startup checks being completed daily?
7.0 Additional items
-
7.1 Mobile phones are not in use at the machine
-
7.2 Other hazards related activities
Actions
-
Action(s) required: also identify who is responsible for the action and by when
Action
-
Corrective action?
-
Responsibility
-
Date for completion of corrective actions
Sign Off
-
Auditor's signature