Titelpagina
-
Uitvoeringslocatie
-
Uitgevoerd op
-
Voorbereid door
-
Locatie
Pre start check list
-
Setting out trench
-
Cat scan from trench and marked
Trench layout
-
With of trench
-
Depth off trench 600mm
-
Trench clean off debris and flat
-
50mm2 naked copper installed in trench
-
Earthing connection below ground for earthing structure with densotape.
-
Earthing connection 95mm for earthing inverter With densotape.
Micro ohms test earthing connectoins
-
Inverter number
-
Picture result
-
Result test
-
Sand above earthing 5cm