Title Page

  • Trenching/Excavation Daily Visual Inspection
    I-5 North Coast Corridor Project

  • Prepared by

  • Competent Person?

  • Conducted on

  • Segment:

  • Location Details:

Inspection

  • Is the Utility Log Updated

  • Max Depth Trench/Excavation

  • Width at Bottom Of Trench/Excavation

  • Length of Trench/Excavation

  • What is the initial soil classification?

  • What Protection Methods will be used?

  • Please Specify:

  • Are the Shores in Good Condition?

  • List Corrective Measures:

  • What is the angle of the slope?

  • Is the Slope in Good Condition?

  • List Corrective Measures:

  • What is the method of access?

  • Are Overhead Power lines Present?

  • List Corrective Measures:

  • Is traffic protection in place?

  • Is there public traffic?

  • List Corrective Measures:

  • Is Ground Water Present?

  • List Corrective Measures:

  • Is Material Piled 2 feet away from excavation?

  • Is there potential for hazardous atmospheres?

  • List Corrective Measures:

  • Are there any other issues affecting the trench?

  • What are the issues?

Photos

  • Add Photos of Trench/Excavation

  • Photos
  • Description

  • Photo

Sign Off

  • Inspected by

  • Person
  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.