Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Hazard Communication
-
MSDS on site and available for review
-
Containers are labeled appropriately
-
Personnel trained and documented
First Aid
-
First aid and blood borne kit available and stocked
-
Personnel, at least one on site, trained in First Aid/CPR
-
Hospital maps and Emergency Boards displayed
-
After hours emergency signs posted
Power Tools
-
Training documented (Hilti tools, etc.)
-
Assured grounding complete on power tools
-
All guards in place on saws, grinders, etc.
-
Damaged tools labeled "Do Not Use" and taken out of work area
-
Compressed air lines secured together
-
Tools used for intended purpose
Cutting/Welding/Hotwork
-
Cylinders upright and secured from tipping
-
Oxygen and acetylene stored 20 feet apart (or appropriate fire barrier)
-
Welding leads damage free
-
Hotwork permit in place with appointed Firewatch
-
Fire extinguishers or water source identified and readily available
-
Welding screens in place
-
Cylinders capped, gauges off, lines bled during storage
Project Site Postings
-
State and Federal labor law postings in place
-
Miron posters in place
-
Client has Superintendent and after hours emergency phone numbers
Environmental
-
Silt fence, sedimentation basins, tracking pads in place
-
Dust control measures in place
-
DNR erosion control reports being completed
-
Hazardous material survey (lead, asbestos, mercury) completed and abated
Concrete/Masonry
-
Wall bracing in place if over 8 feet
-
Limited access zones established, labeled and in good condition
-
Rebar caps in place
-
Silica hazards addressed (wet methods, vacuum, respiratory protection w/training and fit testing)
-
Proper scaffold construction and access
Traffic
-
Signs, barricades and lighting in place
-
High visibility clothing being worn
-
Flaggers used when needed
-
Employee parking established
PPE
-
Eye and face protection in use
-
Respiratory protection in use, proper training and/or medical surveillance and fit testing documented
-
Head, hand and hearing protection in use
-
Appropriate clothing in use
-
Safety toed footwear in use for Miron employees - sturdy footwear for subcontractors
Trenching/Excavation
-
Utilities marked - private and public
-
Excavation permit filled out daily and kept on site
-
Spoils, material and equipment set back 2 feet from edge
-
Proper access provided @ 4', and proper cave-in protection provided @ 5'
-
Properly barricaded when unattended
-
Rigid guard rails placed where exposed to a > 6' drop
-
Trench boxes used, ladders to access box are located inside box, no more than 2 feet of earth exposed below bottom of box
Housekeeping
-
Water, mud, snow and ice managed
-
Aisles, stairwells, passageways clear
-
Materials stacked properly, lumber is free of protruding nails
-
Chemical spill kits available
-
Project field office/break trailers clean
Facilities
-
Recycling system in place
-
Proper number of toilets provided, hand washing stations provided (lead demo, painting, food processing)
-
Tobacco free work site
-
Weapons free work environment
-
Client expectation being met ( hair nets, beard nets, hospital and food regulations )
-
Personal devices not used (cell phone, radios other entertainment devices)
Electrical
-
GFCI's and assured grounded in place on extension cords
-
Power cords elevated and protected from damage
-
Temp lighting adequate and able to be visually inspected/cages around bulbs
-
Compliance with NFPA 70E
-
Temp panel breakers labeled/breakers all in place or blanked
-
Panel covers in place, no open holes
-
Temp panels are self supporting or attached to a wall and inspected monthly
-
Proper clearance from power lines (scaffold, lifts, crane, ladder)
Crane/Rigging
-
Crane on level and firm ground
-
All crane inspections current and documented
-
Swing barriers and anti-two block in place
-
Rigging inspected and stored properly
-
Capacity lags in place and legible (rigging, spreaders, etc.)
-
Proper hand signals or radio communication being used
-
Critical lift plans documented
-
Safety latches in place on all hooks (crane, come-a-longs, chain falls)
Education
-
Daily pre-task and sign in sheets documented
-
Stretch and Flex being performed
-
Project safety orientations completed by all
-
On site training being held as needed
Ladders/Scaffolding
-
Ladders used in full open position
-
Set-ups secured and 36" past landing platform
-
Extension ladders at a 4:1 working angle
-
Hoist rope provided
-
Scaffold properly inspected and signed
-
Plumb, leveled, square and completely decked
-
Solid ground, base plates and mud sills used
-
Secured from tipping over at 4:1 height to base ratio
Air Quality - Medical and Food
-
Barrier walls in place and free from holes
-
Negative air pressure established and monitored
-
Water damage controls in place
-
Foot bath or walk off mats in place and clean
-
Dust control in place, HEPA filters in use and operating properly
-
Hai or beard nets used, smocks or foot covers used
Subcontractors
-
Insurance certificates in and up to date prior to working on site
-
Contracts signed before working on site
-
Pre-installation meetings held as needed
-
Documented meetings held with crew
-
Respirator
-
Other PPE being used properly (protective sleeves and cut resistant gloves during demo)
-
First Aid Kit/Blood Spill Kits in place and fully stocked
-
Hearing protection in place
Fall Protection/Prevention
-
6' fall policy enforced...4' fall policy in place if required (general industry, owner policy, etc.)
-
Toe boards in place where needed
-
Warning lines installed correctly and maintained
-
Fall protection plan in place
-
Equipment in good shape and used correctly
-
Holes > 2" covered, marked and secured
Scaffolding
-
Set up & used properly
-
Inspected before use
-
Proper access
-
Secured/tied/guys in place @4:1
-
Fall protection in place all open sides and edges
-
Stairs equipped with handrails and/or guardrails
-
Slips, trip, fall hazards identified and addressed
-
Harnesses, lanyards, SRL's, and roof carts stored properly
Mobile Equipment
-
Seat belts being used
-
Back up alarms working
-
Inspected and documented daily
-
Cleaned and maintained properly
-
Operators have current, documented training on the equipment they are using
Material Handling
-
Proper lifting techniques being used
-
Loads not flown over people
-
Items secured during transport
-
Tag lines being used
Other
-
Mentor assigned to new employees
-
Monthly Project Manager stand down meeting being performed
-
Monthly Superintendent stand down meeting being performed
-
Add signature
-
Add signature