Title Page
Truck Mounted Concrete Pump Pre-start Assessment
-
Site Address
Contractor Details
-
Name
-
Company
-
Address
-
Plant Type and Serial Number
Part A - Pre-Start - Concreting Company Checks to Confirm Suitability
-
Regular plant maintenance, inspection and testing records<br><br>(Including daily checks, mfr. recommended inspections, major (6 yearly) inspections, thickness tests on pump lines, yearly crack tests)
-
Plant Risk Assessment
-
Generic or site specific SWMS
-
Worker training, HRW licences and CI cards
-
Any required registrations and transport permits
-
Signature of concreting company representative
Part B - Operator onsite pre-start check
-
Has the pumping equipment been inspected and checked prior to use to ensure it is in sound operating condition?
-
Is all the required safety equipment available?<br><br>(Including PPE, bollards/traffic cones, fire extinguisher, first aid kit)
-
Are all equipment manuals and safe operating instructions available on site?
-
Are all scheduled maintenance inspections and logbooks up to date and filled out correctly?
-
Is a SWMS available and has it been reviewed to include any site specific hazards?
-
Are all workers inducted into the site and the SWMS?
-
Is the pump set up location suitable in accordance with the SWMS and manufacturers instructions?
-
Are there adequate traffic management arrangements in place?
-
Is the equipment set up in accordance with the above?
-
Signature of the Pump Operator
Part C - Supervisor to check prior to site operation
-
Have all the above checks by the builder and contractor been completed and any deficiencies addressed?
-
Are there enough trained and competent workers available to safely use the equipment?
-
Are there adequate arrangements for supervision and to ensure safe systems of work are followed?
-
Name of the person responsible for supervising the operation.
-
Signature of the site manager
-
Date and Time