Title Page
-
TSCO Name
-
Company
-
Project/Scheme
-
Observed by
-
Date of Assessment
-
TM Sector Scheme
-
TM Layout Description
-
Current TSCO Classification
-
Proposed TSCO Progression?
-
Lantra Number
-
Contract
-
Site location
-
TM Type
SECTION 1 - GENERAL INFORMATION, KNOWLEDGE, EXPERIENCE & TECHNICAL COMPETENCE ASSESSMENT
-
Has the TSCO candidate completed a satisfactory interview with Octavius Highway Assurance Mgr/Team?
-
Is the TSCO candidate registered as a TSCO?
-
Is the TSCO candidate registered as a TSS?
-
Does the TSCO hold a valid SSSTS (min requirement for TSS) competence/training? If TSCO holds SMSTS then tick this box as compliant as SMSTS is over and above this requirement.
-
Does the TSCO hold a valid SMSTS competence/training."
-
Does the TSCO hold First Aid At Work Competence?
-
Has the TSCO signed up to Octavius TSCO operations RAMS ?
-
Is a TSCO Safety Responsibiloity Statement in place?
-
Has the TSCO completed a satisfactory Safety Critical TM Induction (Octavius TM processes briefing)?
-
Has the TSCO completed the Octavius Safety Critical Communications Training Session?
-
Has the TSCO completed the Octavius Stop Think! Bitesize session for cultural and behavioural safety?
-
Has the TSCO Undertaken/Working towards the IHE qualification in TTME?
-
Has the TSCO worked on relaxed overnight lane closures and carriageway closures?
-
Has the TSCO worked on static TM, without the incorporation of changes to road markings or contraflow operations ?
-
Has the TSCO worked on static TM, incorporating changes to road markings or contraflow operations (Up to 5km)?
-
Has the TSCO experience of Major Schemes, incorporating changes to road markings and contraflow operations?
-
Does the TSCO have a good understanding of TM competency and ratios' requirements? Possibly undertaken the e learning module.
-
Has the TSCO completed the Octavius e-learning module/ training for TM competency rations?
-
Does the TSCO have a clear and correct Understanding of SRN KPI's and calling procedure?
-
Is the TSCO familiar with and understand the implementation of the Over running roadworks procedure?
-
Does the TSCO hold a current 12D M6 Registered Lead Traffic Management Operative competence or an M7 Client Manager Officer (Requirement for TSS)?
SECTION 2 – PAPERWORK & LANTRA / COMPLIANCE CHECKS ASSESSMENT
-
Has the TSCO had a Challenging Conversation with the Highways Responsible Manager?
Job Pack Information to include (and does the TSCO know and can tell you) the following information:
-
- Meeting place for induction & who will the TSCO will be meeting
-
- Details of the project team, PM SM and supervision
-
- Details of works to be undertaken.
-
- Reviewed TM drawing with site recce details (where applicable)
-
- NOMS/NEMS/Permit references
-
- Copy of the TM suppliers RAMS/SWP etc
-
- Other info e.g., co-ordination, install under an RRB etc
TM Layout - Does the TSCO undertsand the TM layout which is due to be installed? (and can the TSCO tell /evidence to you the following information?
-
what the TM layout is?
-
What the timings for the closure are?
-
if there is a specific sequence that the closure needs to be installed and removed in?
-
Has the TSCO performed a competency & ratio check on the TM personnel?
-
Does the TSCO have access to the latest industry standards documentation?
-
Was the TSCO's time keeping and presence on site acceptable. Do they remain on site until the TM crew are all clear from site?
Minimum standards
-
Is all the correct PPE worn by the TSCO, clean, tidy and fit for purpose with the correct company logo?
-
Are all the vehicles compliant with chapter 8 vehicle livery requirements?
-
Does the TSCO have a copy of area specific minimum standards (where applicable) and octavius TM minimum standards?
-
Does the TSCO have the ability to communicate clearly in English? (both written and oral)
Site set up
-
Where a diversion route is installed, was this driven and checked by the TSCO prior to installation commencing?
-
Did the TSCO supervise the installation/removal? (only if safe place to view from)
-
Was a drive through carried out to ensure that the closure has been installed as per the traffic management design.
-
Was a drive past/drive through conducted prior to ensure safe and correctly installed before allowing access to the closure?
-
Were any hazards sought (and if found identified) during the installation/removal of the closure or once the closure had been installed? Please provide more details in the comments section?
-
Was a drive past/drive through conducted by the TSCO prior to ensure safe to hand back to the TM personnel?
SECTION 3 - BEHAVIOURAL & NON-TECHNICAL ASSESSMENT (Situational awareness)
-
Did the TSCO show sufficient attention to detail?
-
Did the TSCO show sufficient Overall awareness?
-
Did the TSCO Maintain focus and concentration ?
-
Was the TSCO able to retain and use/recall all the necessary important information ?
Anticipation of risk - TSCO responses to potential incidents/risks/emergencies posed
-
What would the TSCO do if there was a taper strike? (would this be appropriate in terms of dealing with and reporting the incident?)
-
What would the TSCO do if during the evening the temperature drops to -2 degrees (would this response be appropriate?)
-
When entering the closure where would the TSCO position His/Herself ? (is this safe and appropriate?)
Conscientiousness
-
Did the TSCO have a systematic and thorough approach
-
Did the TSCO carry out checks where applicable
-
Does the TSCO have a positive attitude towards rules compliance ? (Ask why they believe HIPO's still happen)
-
Does the TSCO Understand the purpose of their role and takes their responsibility seriously.
-
Have TM supplier RAMS been read and understood what requirements different TM suppliers may have in place, (I.e. Chevron SWP 026 there should be a breifing prior to lifting the closure, no other TM provider requires this.)
-
Is there a removal procedure in place.
-
How often is maintenance been set at (is this appropriate and compliant)
-
RAM specific question
Communication
-
Did the TSCO communicate well in their brieifngs and conversations to encourage and check on listening (Are people actively listening and did the TSCO encourage and listen to feedback)
-
Clarity - Was the TSCO's breifing understandable and clear on the activity
-
Were open questioning used to check if the group understood the briefing
-
Was there opportunity for the group to ask questions in relation to the breifing
-
Sharing of information - Is the TSCO aware of how many near misses/ TM incursions have occurred on this particular work site)
Workload
-
Can the TSCO manage the amount of TM crews on site
-
How many crews are there
-
How many crews are there?
-
Is the TSCO able to prioritise actions and communications appropriately?
-
Does the TSCO remain calm under pressure ?
Self Management
-
Is the TSCO's time management acceptable?
-
Is the TSCO well prepared and organised?
-
Is the TSCO Alert, Energised, Motivated?
-
Is the TSCO Confirdent in their own ability ?
Maintain and develope skills/Knowledge (keeping up with new legislation, rbt's and Sector Scheme documentation)
-
Can the TSCO tell you where the guidance on omission of RDL's can be found ?
-
Can the TSCO tell you what the guidance is for crossing the carriageway ?
-
Can the TSCO tell you where guidance on preventing/managing TM incursion be found ?
-
Can the TSCO tell yiu where the training requirements for 12A/B and 12D can be found?
-
Can the TSCO tell you where the illumination requirements for signs can be found ?
Octavius Processes , Intiatives & Situational Awareness
-
Has the TSCO been fully breifed on the work activity and do they understand the requirements when working on an Octavius site (Ask open questions from breifing)?
-
Has the TSCO been fully briefed on Octavius TM Assurance processes, including all additional paperwork?
-
Does the TSCO understand what documentation is required from them in terms of post-shift reporting with photo's if necessary - and are they preparing to provide this report/have reported as necessary?
-
Does the TSCO know what form needs to be completed when reporting on the Octavius minimum standard being complied with?
-
Does the TSCO undertsand what the correct action is if a TM incursion has been witnessed (dependent on severity)?
-
Does the TSCO understand what the process is if there is an over run on TM - contract specific
-
Does the TSCO understand the RED/YELLOW card system if you have witnessed an unsafe act?
Completion
-
Feedback
-
Signed by TSCO
-
Signed By Observer