Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Tyre Work Area (TO BE COMPLETED BEFORE STARTING)
-
Is the work area demarcated
-
STOP WORK Do not continue without the area being demarcated
-
Is the work area on flat level ground
-
STOP WORK Do not continue without ensuring the work area is SAFE
-
Does the work area have adequate drainage
-
Consider ground stability before continuing
-
Is the work area free of obstacles
-
STOP WORK Do not continue without clearing work area of obstacles that may be a hazard
-
Is the tyre pad a metal base plate
Work Practices (TO BE COMPLETED BEFORE STARTING)
-
Is the vehicle/machine chocked
-
STOP WORK Do not continue without the Vehicle/machine being correctly chocked
-
Are the chocks adequate for the vehicle/machine size
-
STOP WORK Do not continue without chocks that are adequate for the vehicle/machine size
-
Is the vehicle/machine isolated
-
STOP WORK Do not continue without the vehicle/machine being correctly isolated
-
Is the Restricted Work Zone set up
-
STOP WORK Do not continue without the RESTRICTED WORK ZONE being setup
-
Are all air lines in good condition
-
STOP WORK Replace air lines
Personal Protection Equipment (TO BE COMPLETED BEFORE STARTING)
-
Is PPE being used
-
STOP WORK Do not continue without the correct PPE
-
Is the PPE in good condition
-
STOP WORK Do not continue without the correct PPE
-
Is the PPE suitable for the task
-
STOP WORK Do not continue without the correct PPE
Tooling
-
Is the tooling in good condition
-
Is the tooling fit for purpose
-
USE ONLY FIT FOR PURPOSE TOOLING
-
Could any additional tooling be a benefit to the task
-
List additional Tooling
-
Are vehicle/machine stands suitably labeled with Safe Working Load
-
STOP WORK Use only suitably labeled stands
Plant Clearance
-
Is the Plant clear to return to work
-
Corrective actions for a safe return to work
-
Tyre Fitter
-
The Client must take responsibility of any damage or injury caused if this plant is moved before corrective actions have been completed by a trained and competent person.
-
Client
Paperwork & Documents
-
Has a Pre Start been carried out on the tyre service truck<br>
-
A Pre start inspection must be completed
-
Has a Take 5 been completed
-
Stop Work and Complete a Take 5
-
Was a JHA required for the task
-
Has a JSA been completed?
-
STOP WORK Complete a JSA
-
Are any parts required to be ordered
-
Person approving order
-
Parts Required
-
Are there any tasks that fall outside the normal scope of works
-
Tasks required
-
Person approving variation of works
Job Completion
-
Are all tasks completed and area left safe and clean
-
Corrective actions required
-
Tyre Fitter
-
Client
-
Tire Fitter
-
Client