Title Page

  • Project #

  • Builder

  • Site Supervisor

  • Project Site Address
  • Provide Lot #

  • Partiwall Installers.

  • Conducted on

  • Prepared by

Rondo P140 Bottom Track.

  • Confirm the bottom track is fixed to the slab at 150 mm from the ends & 600 mm centres between.

  • Wall requires urgent rectification prior to proceeding. Adequate fixing to slab must be established at 600 mm maximum centres. Take photos of issue and call UBL supervisor immediately.

  • Confirm that the bottom track has 6mm gaps between tracks to allow for moisture run out.

  • Wall requires urgent rectification prior to proceeding. A 6mm gap allows for moisture to exit the base of the wall, this helps to delay the onset of mold growth when exposed the the weather for long periods. Take photos of issue and call UBL supervisor immediately.

  • Confirm the fire acoustic sealant has been applied along the base of the Shaftliner Fire barrier on at least one side.<br>

  • Wall requires urgent rectification prior to proceeding. Acoustic sealant must be applied to the base track, please apply immediately. Take photos of issue and call UBL supervisor immediately.

Spacing

  • Confirm the cavity between the H-stud or I-stud and frame is in the range of 20mm - 40 mm.

  • Wall requires urgent rectification prior to proceeding. Take photos of issue.

  • Confirm H-Studs or I-Studs are full length pieces and not joined.

  • Wall requires urgent rectification prior to proceeding. Take photos of issue.

Aluminium Partiwall Clips

  • Confirm Aluminium Partiwall clips are fixed to every Partiwall stud directly, and not more than 3000 mm above lower clip line or base track.

  • Is it just one stud missing and Aluminium Partiwall clip, unable to install due to it being obstructed?

  • Take photos and forward to manager.

  • This is ok provided that the stud is clipped on the other side of wall. Take photo of item and move to next question.

  • Confirm Aluminium Partiwall clips have not been substituted with steel or other material.

  • Wall requires urgent rectification prior to proceeding.

Firestop

  • Confirm 16mm Firestop has been correctly installed at mid-floor.

  • Urgent rectification required, must have 16 mm Firestop Plasterboard laminated at 150 mm above and below finished ceiling height.

  • Confirm 16mm Firestop has been correctly laminated at 400 mm centres at floor/ceiling junction and in the roof cavity.

  • Urgent rectification required, must have laminating screws at maximum 400mm centres, vertically and horizontally.

  • Confirm 16mm Firestop laminated one side is not in contact with framing members.

  • Urgent rectification required, 16mm Firestop must not touch framing members.

House Keeping

  • Ensure left over materials are neatly stacked and covered prior to leaving site.

  • Rectify immediately.<br>

  • Ensure waste materials are placed either next to or in bin provided prior to leaving site.

  • Rectify immediately.<br>

  • Please take photos of site condition upon leaving.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.