Information
-
Contractor Safety Check
-
Location:
-
Conducted on
-
Prepared By:
-
Contractor:
-
Technician's Name:
-
Work Request Number:
-
Description of works being undertaken:
Contractor Selection
-
Is the contractor insured?
-
- Public Liability
- Professional Indemnity
- WorkCover
-
Policy Number
-
Insurance Company
-
Limit of Liability
-
Expiry Date
-
Has a certificate of currency been provided?
-
Copy of certificate of currency to be added.
-
Policy Number
-
Insurance Company
-
Limit of Liability
-
Expiry Date
-
Has a certificate of currency been provided?
-
Copy of certificate of currency to be added.
-
Policy Number
-
Insurance Company
-
Limit of Liability
-
Expiry Date
-
Has a certificate of currency been provided?
-
Copy of certificate of currency to be added.
-
You may incur losses when a contractor inadvertently damages your property or exposes you to public liability claims from the public through their own negligent behaviour. Without their own adequate insurance, the contractor may not have the means to compensate you for your loss.
Any contractor that comes onto your site to perform any duties whatsoever must provide you with a current “Certificate of Currency”for Public Liability and Professional Indemnity Insurance (where appropriate). Cover must be for no less than $10 million. -
Action Taken:
-
Does the contractor hold a relevant valid licence for works being<br>performed?
-
Record Licence Details:
-
Only contractors that are licensed to perform the work should be engaged. Failing to use licensed contractors increases the risk of the job not being completed correctly or others being injured as a result of the work being performed.
-
Action Taken:
Pre-work Tasks
-
Is the contractor suitably dressed, presentable and displaying a<br>company branding or ID?
-
Action Taken:
-
Has the contractor completed the site attendance book?
-
Action Taken:
-
Has the contractor been provided with health and safety induction?
-
Action Taken:
-
Check to confirm areas covered in the induction:
-
Asbestos
-
Electrical Safety (location of switchboards / solar installations etc.)
-
Emergency Evacuation Procedures
-
Incident Reporting
-
Working at Heights
-
Working with Children (or in the vicinity of children)
-
Has the Safe Work Method Statement (SWMS) been provided to Site Management?
-
Action Taken:
-
Was consultation around the SWMS undertaken with Site<br>Management?
-
Action Taken:
-
Does the contractor have a first aid kit available?
-
Action Taken:
Monitoring
-
Is the area being worked on free of slip, trip and fall hazards?
-
Action Taken:
-
Is the work area is being maintained with good housekeeping<br>practices?
-
Action Taken:
-
Are barriers used / is traffic managed / signage erected?
-
Action Taken:
-
Are the controls stated within the SWMS being implemented for<br>works currently being undertaken?
-
Is the required PPE available as per the SWMS and is it being worn<br>for the task at hand?
-
Action Taken:
-
Do the controls that have been implemented appear to be<br>effective?
-
Action Taken:
-
Action Taken:
-
Are the Contractors tools and equipment (PPC, RCD, PPE,<br>Extinguishers, meters, gas detectors etc.), tested and tagged?
-
Action Taken:
-
Are the Contractors powered tools with leads connected to a<br>portable RCD Unit?
-
Action Taken:
-
Is the contractor using chemicals, cleaning products or hazardous substances?
-
Are MSDSs available for all substances being used and are they less than 5 years old?
-
Action Taken:
-
Are spill kits available and is there any persons trained on how to<br>use them?
-
Action Taken:
-
Are the substances handled and labelled appropriately?
-
Action Taken:
-
Is mobile plant being used? (Bobcats, Backhoes, Forklifts, etc)
-
Is the plant licensed \ registered and fit for purpose? (Check<br>logbook, record last service date)
-
Last Service Date:
-
Action Taken:
-
Is the plant operator qualified to operate the plant? List licence<br>number:
-
Action Taken:
-
Licence Number:
-
Notes:
-
Photos:
-
Inspector's Name:
-