Information
-
Location:
-
Project Name:
-
General Contractor:
- Barr & Barr
- Gilbane Building Company
- Robins & Morton
- DPR Construction
- Winter Park Construction
- Jack Jennings & Sons
- Whiting Turner
- Summit Contracting
- CPPI
-
Weather - Select all that apply
-
Conducted on:
-
Prepared by:
-
Purpose of audit:
1. Universal Forming Program Requirements
-
1.1 UFI Safety Program Onsite?
-
1.2 SDS/Hazcom Program Current?
12. Scaffolds
-
12.1. OSHA competent person(s) erecting scaffold?
-
12.2. Unsafe or incomplete scaffold?
-
12.3. Toe boards, hand rails and mid rails in place?
-
12.4. Safe Work Load exceeded? (tools, stored materials, number of persons)
-
12.5 Rolling scaffold wheels locked while used?
-
12.6 Working level fully planked?
-
12.7 Each employee 6’ above a lower level protected by guardrails or lifelines?
-
12.8 Scaffold erectors and dismantlers tied off inside of scaffold?
-
12.9 All employees properly trained and documented?
-
12.10 Working level of scaffold fully planked with no more than 1” open space between planks?
-
12.11 Scaffold walkways at least 18” wide?
-
12.12 Scaffold planks extend at least 6” over a support brace and free from splits?