Title Page
-
Conducted on
-
Location
-
Prepared by
-
Contractor
Standard of Workmanship
-
Is this installed as per approved configuration
-
Single or 3phase
-
Inverter Type
-
Panel size
Panels
-
Panels in suitable location
Quality PV Checklist
-
Shading issues
-
Rooftop decktite installed and securely fixed
-
Approved UV protection conduit installed
-
DC array cables approved double insulated
-
DC array cables tidy, supported
-
Approved roof top isolator used
-
Are isolator cover plates installed
-
MC4 Genuine connectors used
-
Heavy duty conduit through ceiling and walls
Structural Checklist
-
Installed in accordance with manufacturers requirements for the climate zone
-
Inverter location
-
Is there sufficient space around inverter
-
Is the inverter accessible as per AS5033
-
Is the inverter Energised
-
Correct labeling
-
IP rating been maintained
Isolators Checklist
-
Is the ground mount DC isolator installed correctly
-
Is the ac isolator mounted in a suitable location as per AS3000
-
Is the AC circuit breaker and cable sized correctly
-
Voltage rise within regulation
-
General workmanship
Earthing Checklist
-
Has the rail been earthed adequately
-
Have the earth rail lugs been gal sprayed
-
Correct installation of panel earth washers
-
Have the correct fixings been used
Monitoring & Export Control
-
Export limiting required
-
Is client account given access to portal