Title Page
-
Name of Person performing inspection
-
Time and Date Inspection:
-
-The following Quality Checks must be performed prior to re-energisation
-
UPS being Inspected (AMS0x.COLOx.CELLx.UPS01x)
-
UPS Serial Number
UPS Inspection
-
Take Photos of the Eaton UPS rating plate
-
Take Photos of all front sections of the UPS with covers removed
-
Take Photos of the ISBM Section
-
Take Photos of UPM 1
-
Take Photos of UPM 2 (not required for IDF UPS)
-
Take Photos of UPM 3 (not required for IDF UPS)
-
Take Photos of UPM 4 (not required for IDF UPS)
-
Take Photos of all UPS front panels including Identification labels
Sign off
-
Mercury Representative
-
Eaton Representitive