Title Page

  • Customer Name

  • Mobile:

  • Email:

  • Address:

  • Property Age (In years):

  • Property Type:

  • Floors:

  • Previous Structural audit done

  • Previous Repair work done

  • Inspection Date and Time:

  • Inspected By:

Site Details

  • Impacted Areas/Rooms

  • Impacted Area
  • Negative side Description

  • Negative side photographs

  • Positive side Description

  • Positive side photographs

Checklists

Inspection Checklists

  • Checklist:

Negative Side Inputs for Balcony

  • Condition of leakage at adjacent wall

  • Condition of leakage below floor of the balcony

  • Leakage during:

  • Leakage due to concealed plumbing

  • Exposed Construction joint: Linear crack from outside/spalling of plaster

  • Leakage due to damage in Nahani traps/Brick Bat coba under tile flooring

Positive Side Inputs for Balcony

  • Gaps/Blackish Dirt observed in Tile Joints

  • Gaps around Nahani Trap Joints

  • Tiles Broken/Loosed Anywhere

  • Mechanical decoration, plants, pots etc observed in balcony

  • Loose plumbing joints/rust around joints and edges

  • Type of tile

Negative Side Inputs For External Wall

  • Condition of leakage at interior side

  • Leakage during:

  • Leakage due to concealed plumbing

  • Internal WC/Bath/Balcony leakage observed

Positive Side Inputs for External Wall

  • Existing type of paint and manufacturer

Stuctural Condition of RCC Members

  • Condition of cracks observed on RCC Column and Beam

  • Condition of rust marks observed in RCC Beam and Column

  • Condition of corrosion/spalling of concrete/exposed reinforcement observed in column/beams/roof slab ceiling

  • Expansion joints condition if any

Condition of External wall

  • Are there any major or minor cracks observed over external surface?

  • Are the sealants applied on the window frame joints intact?

  • Condition of wall mounted AC Frames, holes, drain pipes over the wall.

  • Are the external plumbing pipes cracked and leaked? If yes its condition.

  • Are the openings around the pipes in external wall properly grouted? If not its condition.

  • Condition of any vegetation growth, dish antennas fixed on parapet wall observed?

Condition of Adhesion of old paint

  • Chalking and flaking in paint film.

  • Algae fungus and Moss observed on external wall?

  • Bird droppings condition observed on external wall and Chajja

  • Condition of corrosion on metal rods and MS window grills

Substrate condition of Plaster

  • Patchwork plaster required? if yes its condition?

  • Entire replaster required? if yes its condition?

  • Condition of separation cracks observed at beam-column junction

  • Condition of leakage observed from overhead water tank

  • Loose plaster/hollow sound on external surfaces?if observed, its condition?

Negative Side Inputs for Terrace

  • Condition of leakage in ceiling below terrace slab

  • Condition of leakage near ceiling and wall corner junction

  • Season of leakage

  • Leakage due to concealed Plumbing

Positive Side inputs for terrace

  • Existing waterproofing system

Structural Condition Assessment of Terrace

  • Condition of existing waterproofing system

  • Condition of debris on roof

  • Condition of adequate slope provided (1:100 or 1:80)

  • Adequate no. of rain water outlets provided

  • Condition of waterponding , water getting accumulated at one place or near drain outlet point

  • Condition of finishing around upstands of waterpipelines/solar water heater/solar PV or any other instruments etc

  • Condition of leakage from supply lines/rainwater outlets

  • Surface cracks condition observed on terrace/broken tiles

  • Hollow surface condition identified and checked by nylon hammer

  • Condition of surface finishing for chemical/membrane application

  • Condition of any cracks/absence of proper watta/fillet at junction of roof terrace and parapet wall.

  • Expansion joint condition if any

  • Growth of vegetation

  • Condition of parapet wall Top (specify: Naked/Tiled)

  • Condition of damage due to dish antenna, manual drilling/any other damage on parapet wall

  • Terrace staircase tops/Topi, exterior wall and threshold condition

  • Condition of any concealed plumbing connections found at terrace

General Information of Structure

  • When was the last paint done? (Month & Year)

  • Type of Paint

  • Existing condition of paint

  • Defects on paint surface

  • Existing condition of the surface (Remarks: Undulations and Offsets)

  • Paint application finishing base. (Remarks: Previous Process)

  • Leakage observed on the walls:

  • Gaps between walls and Floors:

  • Significant Cracks or holes, dents on surface:

  • Cracks connecting with door/window frames or other element

  • Obstacles for Paint application:

  • Customer Requirement:

  • Overall Observation

  • Type of Painting to be done?

  • Measurements:

  • Additional Comments/Important notes, if any

Negative Side Inputs

  • Leakage Status on adjacent wall

  • Leakage status below floor of the bathroom

  • Leakage due to concealed Plumbing

  • Leakage due to damage in Nahani Trap/Brick Bat Coba under tile flooring

  • Leakage During

Positive Side Inputs

  • Gaps/Blackish dirt observed in tile joints

  • Gaps around Nahani Trap Joints

  • Tiles Broken/Loosed anywhere

  • Loose Plumbing joints/rust around joints & edges

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.