Title Page

  • Conducted on

  • Prepared by

  • Client

  • Job Number (photograph permit board if applicable)

  • Location

ACTIVITY

  • What is the planned activity?

  • What is the diameter of the parent main?

  • What is the diameter of the outlet?

  • What diameter is the main?

  • What diameter is the main?

  • What diameter is the main?

PRE START SAFETY CHECKS

  • Has permission been given for you to enter the site?

  • Have you signed in?

  • Has the Principal Contractor provided a site-specific induction?

  • Are you aware of the Fire and Emergency/Evacuation arrangements?

  • Are you aware of the First Aid arrangements?

  • Has Chapter 8 signing, lighting, guarding and traffic management been established?

  • Has a provision been made for parking and loading/unloading of vehicles safely?

  • Has a safe working area been provided, with segregation of the public and third parties?

  • Is the working area secure, with adequate provision for storage of equipment?

  • Are there adequate emergency escape routes from all areas of the site?

  • Has an adequate risk assessment been prepared for the tasks to be undertaken?

  • Do the RAMS address all the planned tasks and activities?

  • Are CoSHH Assessments available and been briefed?

  • Have the appropriate permits to work been issued by the asset owner (Water Authority)?

  • Have welfare facilities been arranged for the site - suitable for tasks/number of workers?

  • Do you have all the PPE required by the Risk Assessments and any client requirements?

  • Do you have the required skills and training records for the planned tasks?

  • Do you hold all required competency cards applicable to the scope of works?

  • Does the activity require entry into an excavation?

  • Are the excavation dimensions adequate for the planned activity?

  • Is the excavation shored, supported or battered?

  • Is there a safe and secured method of access and egress?

  • Are barriers in position to prevent people or objects falling into the excavation?

  • Has edge protection, including guard rails and toe-boards been provided?

  • Has the excavation been assigned a confined space classification to NC standards?

  • Which category of confined space?

  • Are all operatives entering the excavation confined space trained?

  • Have Rescue and Emergency Arrangements been established and briefed?

  • Has unauthorised entry to the excavation been prevented?

  • Are plant and materials stored at a safe distance from the excavation?

  • Has the excavation been inspected by a competent person at the start of the current shift?

HANDOVER

  • Was the activity completed as planned?

  • Did the work require a pressure test?

  • What was the test pressure?

  • What was the test duration?

  • What was the test result?

Signed:

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.