Title Page
-
Site conducted
-
Conducted on
-
Inspection by
-
Position
General Checks
-
Have there been any new cable install penetrations since the last monthly inspection?
-
Has the CBRE ICT team used the iAuditor form correctly and in accordance with the defined process?
-
Has CBRE Account Management completed a minimum of 10% checks of the submitted iAuditor forms as part of the monthly quality check?
-
Has CBRE Account Management completed a minimum of three (3) physical quality checks?
-
Are the CBRE management quality check results included and presented to Global Switch at the account monthly/quarterly business review?
-
Have areas of inadequate or compromised fire-stopping been identified & formally recorded during cable installs?
-
Are these being escalated to Global Switch?
Physical Cable Install Checks
- Physical Check
-
Location of cable install
-
Date & Time of cable install
-
Cable install job reference No.
-
Has the CBRE ICT team used the iAuditor form to record the pre-works safety checks?
-
Has the CBRE ICT team used the iAuditor form to record pre-works area/site images/photos?
-
Has the CBRE ICT team used the iAuditor form to record details of any fire compartments to be crossed?
-
Has the CBRE ICT team used the iAuditor form to record the post-install works, including images of any fire-stopping applied?
-
Has the installed entry point(s) been used?
-
Why hasn't the installed entry point for this installation occurred?
-
Is the new penetration(s) through fire compartments appropriately sealed with approved fire-stopping materials? - (take a photo for evidence)
General Comments
-
Are there any further comments or recommendations arising from this inspection?
-
Have corrective actions been raised against all identified issues or concerns?
Sign Off
-
Name & Signature of person doing inspection
-
Position