Information
-
Person conducting Assessment
-
Document No.
-
Conducted on
-
By signing this document the above employees agree to having taken part in the Toolbox talk and agree that the checklist items have been completed as indicated
Pre-Work Information
COVID-19 Declaration
-
Do any workers feel unwell?
-
Please notify your USI coordinators
Pre-Work Information
-
Does the work party have all SWMS required for the shift?
-
Have the site SWMS been read and understood by all workers on site?
-
Does the work party have all COVID Safe plans required and has been read and understood by all workers on site?
-
Are all workers Depot inducted to the sites they will be working on during the shift?
-
Are all required SDS's and a hazardous substances register present?
-
Are all power tools and electrical leads tested and tagged and in date?
-
Is there a fully stocked first aid kit with the team?
- Yes
- No
- N/A
Toolbox Talk
Toolbox talk topics of discussion
-
(Thought points to consider - weather conditions, workers notes, safety issues, aspects specific to job being performed during the day) -
Have you discussed the following:
-
Toolbox topic 1: Preventing Falls
-
Toolbox topic 2: Site PPE
-
Toolbox topic 4: Access Points - roofs, ladder brackets
-
Toolbox topic 5: Depot Covid protocols
-
Toolbox Topic 6: Reporting Incidents, Near miss or verbal altercations
Equipment / PPE / Fatigue Management Checks
Equipment Checks
-
Which ladders are you using?
- Fibgreglass Step ladder
- Aluminium Step ladder
- N/A
-
Are all ladders safe to use (dent and crack free)?
PPE - all workers must check they have the following items present with them and that they are in serviceable condition
-
Do all staff have a hi-vis vest in an approved colour and style?
-
Are all staff wearing steel capped boots?
-
All staff wearing face masks when required with the NSW Health Laws?
Sign off
Sign off
-
Team Leader
-
Installer
-
Installer
-
Installer
-
Installer
-
Installer
-
Installer
-
Installer
-
Installer
-
Installer
-
Insert photo of my issues