Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

  • Add location
  • Has the proper utility services, identifications and locations been made? (CALL 811 for locates 3 days before digging)

  • Is the excavation properly supervised by a person that has completed "Competent Persons" training?

  • Has the employees been properly trained on heat stress? (if needed)

  • Has the soil been identified for sloping/shoring purposes? (soil or rock type max allowable slops (H:V) 1 for excavations less than 20ft deep), Stable Rock: Vertical (90)<br>TYPE A 3/4:1(53 degree)-TYPE B 1:1(45 degree)-TYPE C -1/2:1(34degree) This is typical for soil around the Greater Seattle Area.

  • Add media

  • Are there ladders and ramps provided for exit from excavations? (Ladder or ramp exit every 25ft)

  • Add media

  • Is the excavation a confined space?:<br>

  • Has the air quality been checked with a recently calibrated 4 Gas Meter? (please provide calibration dates)

  • Materials and equipment stored at least 2 feet from the edge?

  • Add media

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.