Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Nature of the works
-
Location
-
Client / Principal contractor
Behaviour. When you arrive on site, what do you see?
-
People adjusting PPE
-
People changing their position
-
Supervisors stopping the job
-
People altering machinery / equipment
Work Environment - Are people at risk of:
-
Striking against objects
-
Being caught between objects
-
Exposure to extreme temperatures
-
Exposure to hazardous substances
-
Being struck by objects including vehicles and plant
-
Falling from heights / slipping, tripping
-
Contact with electricity
-
Injury due to lifting, pushing or pulling
procedures and housekeeping
-
Are procedures clear
-
Is the work area tidy
-
Are materials stored suitably
-
Are safety critical staff clearly identifiable
-
Are there first aid provisions
-
Are procedures being followed
-
Do methodologies and SSOW cover the work undertaken
-
Is suitable waste management in place
-
Are instructions clearly given
-
Do staff have the relevant Competencies for the task
-
Are staff up to date on the latest toolbox talks / safety briefings
Tools and equipment - Do you see:
-
Wrong tools being used
-
Exposure to vibrating equipment
-
Adequate lighting for the task
-
People working too close to plant
-
Damaged tools in use
-
People exposed to excessive noise
-
Spill kits available
-
Calibrated tools and equipment within test due date
Continued
Personal Protective Equipment
-
Being Worn
-
Suitable for the task
-
In good condition
-
Is a contingency supply available
-
If staff wear contacts do they carry spectacles in case of emergency
-
Is task specific PPE required. If so, please specifiy
Site welfare facilities
-
Adequate
-
Clean condition
-
Clean soap and water available
-
Are facilities close enough for the site staff