1.0 Tools & Equipment
-
1.1 Are all tools and equipment in the work area used?
-
1.2 Have all unneeded objects been removed from the station? Objects Quarantined and been identified for a permanent removal decision.
-
1.3 Does each tool have a dedicated storage? Nothing should be laid on the ground, everything is in a container or on a pallet.
-
1.4 Is there only required equipment at the station? Examine the size of stock parts, ect.
2.0 Consumables, Parts, Chemicals, Files, Documents & Manuals
-
2.1 All unused Items Removed?
-
2.2 Is the part storage method at the station working? Usable, expiry date, FIFO in place.
-
2.3 Does each item have an identified place? Nothing is laid on the ground, everything is at least in a container or pallet.
-
2.4 Is there any overstock in the workplace?
-
2.5 Are consumables and chemicals clearly identified?
3.0 Work Area
-
3.1 Do we have the required equipment to do the job? Is it close to the work area? Is it available? Are there any safety or ergonomic risks?
-
3.2 Is the equipment complete and functional? If not, have the issues been identified with a tag and put on the tag action list?
-
3.4 Are there recycle bins in the work area? Are they sufficient? Are they properly used?
-
3.5 Has all rubbish been removed from the work area? If not, have items yet to be removed been tagged for removal?
-
3.6 Are there any unused electrical/computer/ air cables?
-
3.7 Are any of the display materials unnecessary or outdated? Is there any display missing that should be there? Has the 5S workshop been identified?
-
3.8 Have all personal items been properly sorted?
-