Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Location
  • Personnel

  • F10 displayed on site and details correct

  • Health & Safety Policy signed, in date and displayed on site

  • Insurances in date and displayed on site

  • Health & Safety Law Poster displayed

  • Construction Phase Plan on site and relevant to the project

  • RAMS are on site and they are suitable and sufficient for works. Signed by operatives

  • COSHH Data Sheets and Assessments are present on site and have been communicated

  • All items of PPE being worn correctly for site/ task requirements

  • Fire Risk Assessments are available and adequate for site

  • Hot Works Permits are present and being used correctly

  • Correct Fire Fighting Media is available on site and adequate

  • Evidence of operatives training is present on site

  • Evidence of effective induction training is available on site

  • Working at height is being carried out safely

  • Noisy work is being appropriately controlled

  • Access equipment is suitable, being stored safelyand used correctly on site

  • Scaffolding has been erected in accordance with BS EN128 11 TG20 13 and to company standards

  • Scaffolding has been inspected in accordance with WAHR 2005

  • Scaffold hand over documents are present and being used effectively

  • Evidence is available on site to show all electrical works is being carried out by Part P 17th addition electrical contractors

  • All electrical items are correctly PA Tested and within compliance

  • Evidence is available to show all gas works are being carried out by Gas Safe Engineers

  • There is evidence to show the CP12 is being used appropriately on site

  • Health Hazards are being adequately controlled on site

  • Clean welfare facilities are provided and meet CDM requirements

  • Adequately trained First Aid personnel are on site

  • Adequate First aid equipment is available on site

  • Traffic management plan is on site and being followed

  • Housekeeping is being well maintained. Site is clean and tidy

  • Adequate fencing/ barriers are provided dangerous areas

  • Security arrangements are appropriate to prevent danger to the public

  • Public inferface is well managed

  • Asbestos risks have been identified, assessed and safe systems of work have been developed

  • Site managers weekly inspection has been completed as required.

  • Toolbox talks are being carried out at least once a week

  • Accident / Incident procedures are displayed on site and correct

  • All over head cables are adequately protected where necessary

  • All environmental hazards have been identified and adequate control measures are in place

  • Date and Time

  • Signature of Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.