Information
-
Report Title
-
Location.
-
Client Name.
-
Tenure.
- Owner occupier
- Local Authority
- Housing Association
- Privately Rented
-
Property Type.
- Mid-Terrace
- End terrace
- Semi-detached
- Detached
- Ground Floor Flat
- Middle Floor Flat
- Top Floor Flat
- Masonette
- Bungalow
- House
- Commercial Building
Property details
-
Report conducted by.
-
Confirmation that relevant checks have been undertaken to determine if the presence of any asbestos containing material is present?
External Inspection
-
Please take photos of all elevations
-
What is the external finish of the property
- Brick
- Brick/Render
- Painted Render
- Recon Stone/Sand Stone
- Pebble Dash/Spar
- Tile hung cladding
- PVC cladding
- Timber cladding
-
Is the external finish in a good condition
-
Are there signs of horizontal/vertical cracking
-
Are there any obstructions that will hinder the survey or installation work
-
If yes please take photographic evidence
-
Are there any access issues
-
If yes please take photographic evidence
Wall Ties Condition
-
Are the property walls insulated
-
If yes what product is installed
-
Has the property had a CWI extraction carried out
-
Are all elevations clear of material and rubble
-
What are the condition of the cavity wall ties in situ
-
If poor please briefly explain
-
Is wall tie replacement and isolation required
-
If yes, what is the m2 of the area requiring work
-
What is the cavity depth
Borescope Photos of wall ties
-
Front Elevation (min 4)
-
Rear Elevation (min 4)
-
Right Hand Elevation (min 4)
-
Left Hand Elevation (min 4)
-
Extensions (min 4)
Surveyors Report
-
Please write a brief statement of your findings and attach the detailed summary
-
Surveyors Name
-
Date
Dynamic Risk Assessment & Client Declaration
Dynamic Risk Assessment.
-
Reversing vehicle.
-
Asbestos.
-
Overhead electricity cables.
-
Use of a step ladders or ladder.
-
Use of a mobile tower.
-
Manual Handling.
-
Working on a roof.
-
Hand tools.
-
Vibration.
-
Noise.
-
Electricity/Generator
-
Compressed air.
-
House keeping.
-
Installation of cavity wall.
-
Working with wet cement, concrete and mortar.
-
Use of mobile elevation working platform (mewp).
-
Lone worker.
-
Assessors signature
-
Date: