Title Page
-
Site conducted
-
Prepared by
-
FLOOR
-
Elevation
-
Conducted on
QA Inspection
Bird Wire
-
Has the correct amount of shoes supports been used
-
Are the shoes spacing between each other correct
-
Are the wiring installed correctly
Installation of Mastic
-
Have the mastic been applied to all required areas
-
Has the correct amount of mastic been used in each joint
-
Have the mastic to the pressings and brickwork completed to its standard
Cleaning and Making good
-
Have the areas been cleaned
-
has the brickwork been repaired
-
Has the pressings been sprayed as per the making good recommendations
-
Henry site manager
-
Date