Title Page

  • Conducted on

  • Location of QA

  • Photos of location

  • Prepared by

QA Inspection

Tyvek Fire curb

  • Has the Tyvek fire curb been installed

  • Has the correct double sided tape been used

  • Has the correct amount of overlapping been applied

  • is the over lap the correct way round top over bottom

  • Has the correct acrylic tape been applied to all joints

  • Is the Tyvek fire curb free from damage

  • Date & Time of inspection

  • Inspected by

  • Inspected by

  • Photo of elevation

TOP HATS

  • Has the correct top hat been installed

  • Has the top hat been installed to the correct centre's

  • Has the top hat been fixed to the SFS studs

  • has the correct fixings been used

  • Has the top hat been installed to the correct Hight & Level

  • Date & time of inspection

  • Inspected by

  • Inspected by

  • Photo of elevation

Helping Hand Brackets

  • Have the correct helping hand and brackets been used

  • Have the helping hands been set out correct as per design

  • Have all brackets been installed correct as per design

  • Have the correct fixings been used as per design

  • Has the horizontal bracket been installed

  • Has the horizontal brackets been fixed as per design

  • Has the correct slots and dead fix positions been used on the brackets

  • Date & Time of inspection

  • Inspected by

  • Inspected by

  • Photo of elevation

Fire stops HOLD POINT

  • Has the fire strategy location DWG been followed

  • Has the correct FSI paraflam 120 & 75 vertical fire barriers been installed

  • Are the vertical FSI fire barriers installed correct 2 non- combustible fixings centers per 1000mm piece

  • Have the retaining brackets been inserted 75%into the vertical fire barrier and has made intimate contact with substrate

  • Have all vertical fire barriers been tightly abutted

  • Is the vertical fire barriers under the correct compression minimum 5-10mm

  • Has the foil tape been applied to all joints and corners, internally & externally

  • Has foil tape been applied to all abutted joints and not covering the Intermescent strip

  • Has the correct FSI specification OSCB 75/25 horizontal fire barriers been installed

  • Have the horizontal retaining brackets been installed 3 brackets per 1000mm piece fixed at 250mm, 500mm and 750mm centers using non-combustible fixings

  • Have the horizontal fire barriers been installed with intimate contact with substrate

  • Have the horizontal fire barriers been installed tightly between all brackets

  • Has the required open cavity been achieved max gap of 25mm

  • Has the pig tails been installed correct and at the correct centers 250,500,750 per 1000mm

  • Date and time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

Insulation

  • Has the correct spec insulation been installed

  • Has the insulation been abutted to each other with no visible gaps

  • Has the insulation been installed with intimate contact with substrate

  • Has the insulation been cut tightly around bracket penetrations

  • Has the correct fixings been used

  • Is the insulation free from damages

  • Date and time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

Horizontal & Vertical rails

  • Has the correct Horizontal rail been used

  • Has sufficient fixings been installed to the horizontal rails

  • Have the correct dead fix and elongated holes been used

  • Has the correct terracotta rails been used

  • Has the terracotta rails been fixed correct

  • Are all rail correct as per grid line and datum

  • Are all rails lined and level

  • Are the terracotta channels free from bends / damage

  • Has sufficient fixings been installed to the terracotta rails

  • Has the setting out been followed as per design

  • Date & Time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

Terracotta

  • Has the correct type of Tile been installed

  • Are the Tiles sitting on the clips correct

  • Are the Tiles lining up with each other

  • Are the Tiles flush with each other

  • Has the correct pattern been followed

  • Has the 10mm gap been maintained between tiles

  • Has the 30mm deflection joint been maintained

  • Has the cover plates been installed

  • is the Tiles free from damage

  • Has the movement joint been maintained

  • Date & Time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.