Information
-
Conducted on
-
Conducted By
-
Location
Permit/Licence number
-
undefined
-
Weather conditions
-
Date of last inspection
-
Date of last Regulator inspection e.g. NRW, Planning Authority?
1. Compliance
-
1.1 When was the site last inspected by a Regulator e.g. NRW, EA or Planning Authority?
-
1.2. Has the site received any environmental or safety complaints in the last 12 months?
-
1.3. Has the site received any regulatory non-compliances in the last 12 months?
-
1.3.1 If 'Yes' is site now compliant and what mitigation action was taken?
-
1.4 Are all waste collection vehicles properly maintained and roadworthy?
-
1.5 Are collection vehicles correctly sheeted (or waste fully contained within lorry) on arrival to site?
2. Staff training
-
2.1 Are site operatives trained in proper waste handling and disposal practices?
-
2.2 Are staff members trained on how to respond to an emergency environmental incident?
-
Take pictures of all vehicles
-
2.3. Are site operatives wearing the correct PPE?
3. Visual Inspection
-
3.1. Is general housekeeping around operational site good?
-
3.2 Is there any visible leachate e.g. directly visible or stains on ground?
-
3.2 Is there any excessive pooling of surface water?
-
3.3. Are there any surface water drains present within operational areas - particularly material storage areas?
-
3.3.1. If yes to above - are there any drain pretention measures in place in the event of a spill?
-
3.4. Are materials correctly stored to prevent environmental impacts?
-
3.5. Is there any wind-blown waste associated with site operations?
-
3.6. Are any liquid chemicals - including fuel and Adblue - stored within binding or containment?
-
3.7. Are waste materials stored in such a way as to prevent environmental impacts? e.g. under cover, netted, within designated compounds.
-
3.6. Are there any other environmental issues found on site?
4. Wider environmental aspects
-
4.1 Are there any odours associated with site operations?
-
4.2. Is noise or vibration from site operations compliant with permit/licence conditions?
-
4.3. Have any measures been put in place to reduce the visual impact of the site?
Comments
-
undefined