Title Page
-
Project Name
-
Conducted on (Date and Time)
-
Officer in Charge (Full Name)
-
Location
Internal Planning
-
Have you internally agreed on the need for a waste management plan and allocated staff responsibility?
-
Have you checked any tendering, contractual or rating tool requirements for a waste management plan?
-
Have relevant sub-contractors agreed to follow the waste management plan?
Design
-
Have material quantities been selected to minimize over-ordering?
-
Has consideration been given to the use of secondary and recycled materials?
-
Can unwanted packaging be returned to the supplier for recycling or re-use?
-
Can unused materials be returned to the supplier or used on another job?
-
Have designers used standard material sizes wherever possible?
Project Planning
-
Has responsibility for waste management planning and compliance with environmental legislation been communicated to all staff and identified subcontractors?
-
Have you identified likely waste arising (how much, when, and what types)?
-
Has an area of the site been designated for waste management and bins?
-
Has the time between delivery of materials and installation been minimized, to reduce the risk of damage to materials, which turns into waste?
-
Have waste targets been set for the different types of waste likely to arise from the project?
-
Have measures been put in place to deal with any hazardous waste?
-
Have you considered the implications of the disposal of liquid wastes such as wash-down water and lubricants?
-
Have you checked any requirements for water wastes with the Water Corporation or Swan River Trust (if applicable)?
-
Have opportunities been considered for re-use or reprocessing of materials on-site?
-
Have you researched disposal costs for separated waste that may have a commercial value?
Recycling
-
Has responsibility for waste management on-site and compliance with environmental legislation been assigned to a named individual regularly onsite?
-
Have toolbox talks or inductions been planned for all site personnel about waste management on-site?
-
Are selected waste materials separated to allow the best value to be obtained from recycling waste management practices?
-
Are containers/bins clearly labeled to avoid confusion/contamination?
-
During operations, have you monitored that waste is being placed in the bins correctly if using the source separation system?
-
During site operations, are barriers to good waste management noted for incorporation into the post-completion review?
-
Have you made sure that the bins are, where possible, removed from view, to help avoid illegal dumping of rubbish?
Post
-
Has a final report of use of recycled materials, waste reduction, and separation, with costs and savings identified, been completed?
-
Have key waste management successes been considered for action at future projects?
-
Have you considered promotional opportunities for any successes eg. awards programs, local media, industry media (eg. Master Builder Magazine) or in staff newsletters?
Completion
-
Recommendations
-
Officer in Charge (Full Name and Signature)