Information
-
Crossing Type:
-
Pressure Zone:
-
RoW ID:
-
Conducted on
-
Prepared by
-
Personnel
-
Erosion and sediment controls installed according to aproved plans and registers (placement and frequency)
-
ESC devices installed correctly
-
Coir logs have NOT been installed on bed of water crossing
-
RoW profile is neat and free of loose material
-
Water crossing is delineated to prevent access
-
No evidence of erosion
-
No evidence of sediment deposition in the crossing
-
Topsoil windrow is protected by an earthen bund, mulch berm, sediment fence or coir log
-
Topsoil windrow is beyond the high bank of the crossing
-
Subsoil stock piles are protected by sediment controls
-
Subsoil stockpiles are 100m beyond the high bank of the crossing
-
Bed Level crossings have been installed correctly
-
Ripple pads are free of sediment build up
-
Banks and bed of the crossing are stabilised with jute or other geotextile
-
Batters of cutting are stabilised with jute or other geotextile
-
Batters are of a stable landform and will support vegetative growth for rehab (min 2:!, pref 3:1)
-
Standing water requires pump-out
-
Does the crossing require additional ESC devices or maintenance: