Title Page
-
Conducted on
-
Site address
-
Prepared by
-
Engineers Name
-
Work in progress during inspection?
-
Post works visit?
-
Warning signs?
-
Correct PPE available and worn appropriately
Type of works
-
Installation 1st fix?
Front / Rear entrance to property
-
Accessories at correct heights
-
Smoke alarm present
-
Outside light silicone sealed
Lounge Area
-
Old accessories removed
-
Accessories at correct heights
-
Cappings secure and flush with plaster level
-
Double pole switch for fire
-
Light at the centre of the room
Kitchen Area
-
Old accessories removed
-
All accessories at correct height and locations
-
150mm space from cooker to accessories
-
300mm space from sink to accessories
-
Heat detector fitted where applicable
Bedrooms
-
Old accessories removed
-
New accessories in correct locations
-
Cappings behind plasterline
-
Boiler in bedroom
-
CO detector fitted where applicable
Bathroom
-
Old accessories removed
-
Fan wired to suitable location
-
Shower fitted
-
Accessories in correct zones
Consumer Unit / Meter
-
Consumer unit fitted in an accessible location
-
Securely fixed?
-
Consumer unit labelled with all relevant stickers?
-
IP and fire rated?
-
Isolator fitted?
General
-
Gas and Water Bond visible?
-
Routing of cables acceptable?
-
Safe plates where applicable?
-
50mm centre joist holes
-
Equipment and cable leads PAT tested
-
All floorboards secured
-
Housekeeping performance detailed
-
Installation 2nd fix?
Front / Rear entrance to the property
-
Outside light secured and siliconed?
-
Chases flush with plaster?
-
Accessories securely fastened / level
-
Smoke alarm in acceptable location
-
Functional switches work correctly
Lounge Area
-
Accessories securely fastened / level
-
Accessories in correct locations?
-
Any item 150mm from gas pipe?
-
Functional switches work correctly?
Bedrooms
-
Accessories securely fastened / level
-
Chases flush with plaster?
-
Functional switches work correctly?
Bathroom
-
IP rated light?
-
Pull chords securely fastened?
-
Fan functional?
-
Shower secure where applicable?
Consumer unit / meter
-
Consumer unit secure?
-
Unit correctly labelled?
-
Blank plates fitted?
-
Trunking secure?
-
Test sticker visible?
General
-
3Amp fuses where applicable?
-
Relevant switch wires over-sleeved?
-
Room stat location correct?
-
Gas and Water Bond visible and tagged?
-
Housekeeping performance detailed
-
Repairs & Maintenance?
General
-
Work to BS7671 2008
-
Appropriate materials used?
-
Any damage rectified?
-
Installed correctly and accompanied with certificate?
-
DIY removed where applicable?
-
Housekeeping performance detailed
If tenant is present?
-
Is the tenant satisfied with the work?
-
Did the Engineer wear overshoes?
-
Did the Engineer show their ID?
-
Inspection and Testing?
General
-
Inspection and test date sticker on consumer unit?
-
Testing schedule on consumer unit?
-
RCD quarterly test sticker in place?
-
DIY wiring removed if applicable?
-
Evidence of removal of accessories?
-
Bonding conductors in pace and visible?
-
Hard wired smoke detectors 2 years in date
-
Certification correctly filled out?
-
General comments if applicable?
If tenant is present?
-
Is the tenant satisfied with the work?
-
Did the Engineer wear overshoes?
-
Did the Engineer show their ID?
-
Site Inspections?
-
Extension cables run safely free of trip hazards
-
Extension cables in good condition?
-
All electrical equipment PAT tested and in date?
-
All electrical equipment 110v?
-
Live electrical sources clearly marked up?
-
Emergency lock off clearly located?
-
All electrical equipment stored correctly?
-
Meter rooms locked and secure?
-
Housekeeping performance detailed
-
Name of Assessor