Information

  • Q5600 - APLNG West Gathering Network

  • Pressure Zone

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • ROW / Work Zones Inspected

  • Conducted on

  • Inspected by

  • Document No. (YYYYMMDD_PressureZone_CEMP)

Air Quality

  • Dust emissions adequately controlled around site.

  • Plant and vehicles turned off when not required.

Noise and Vibration

  • Construction activities only occur during designated work hours.

  • All construction equipment fitted with appropriate noise abatement devices.

Land Management

  • No disturbance outside approved area.

  • All vehicle movement restricted to designated access roads and tracks.

  • Fences and gates are installed, maintained and reinstated.

Water Management

  • Watercourse crossings stabilised using protective materials until vegetative cover is re-established.

  • Clearing slopes leading to watercourses delayed until construction of the crossing is imminent; or appropriate ESC measures are in place.

  • Water quality does not exceed approved parameters.

  • No sediment laden water discharged within 100m of any wetland, waterway or watercourse.

  • No chemicals and hazardous substances stored within 100m of any wetland, waterway or watercourse.

  • No refuelling of plant within 100m of any wetland, waterway or watercourse.

  • Machinery, materials and amenities not located within 100m of any wetland, waterway or watercourse.

Soil Management

  • Topsoil stockpiles less than 2m in height.

  • Stockpiles do not impede the movement of fauna, stock and vehicles across the construction area.

  • Stockpiles do not impede natural or constructed surface drainage channels or access tracks.

  • No subsoil stockpiles within 100m of a watercourse.

  • No evidence of erosion or weed growth on soil stockpiles.

Erosion and Sediment Control

  • Erosion and sediment controls installed and functioning correctly, particularly in areas expected to receive concentrated flow.

  • Sediment control structures maintained in working order.

  • No obvious evidence of erosion and / or sediment deposition in drainage areas.

  • Soil stockpiles protected with sediment fences along the down slope side - where required.

  • Run-off waters diverted around work areas or conveyed through appropriate erosion and sediment controls.

Flora

  • Staff briefed on ESAs and threatened species present or likely to be present on site.

  • No NCA listed flora disturbed without permit.

  • Vegetation to be retained clearly marked and protected.

  • Machinery, materials and amenities not to be located within tree protection zone.

  • Hollow logs assessed and preserved for habitat value.

Fauna

  • No active breeding places disturbed without approval.

  • Fauna Spotter Catcher present during clearing activities.

  • Trenches and open excavations inspected for fauna.

  • Open trenches backfilled as soon as practicable.

  • Trench breaks / plugs / earth ramps placed at appropriate intervals to facilitate fauna movement.

  • Pipe end caps in place for all strung sections of pipes.

Pest and Weed Management

  • No declared weeds present within construction area.

  • All vehicles and plant have valid Vehicle Hygiene Inspections.

  • Weed material disposed of in accordance with the pest and weed management plan.

  • Water holding containers, ponds and vessels free from mosquito and midge larvae.

Dangerous Goods and Hazardous Materials

  • All hazardous substances stored and bunded in accordance with the relevant MSDS and regulations.

  • Temporary bunding, drip trays or impermeable matting is being utilised during in-field refuelling and/or maintenance.

  • Spill kits fully stocked and placed in vehicles/plant and suitable static locations.

  • All spills cleaned up and reported according to WDS procedures.

Waste Management

  • Waste material is appropriately separated, stored and labelled.

  • No waste or litter on site, including in trenches and excavations.

  • Waste containers and storage areas not exceeding capacity.

  • Site amenities inspected and functioning correctly.

Reinstatement and Rehabilitation

  • Disturbed subsoils ripped prior to topsoil replacement.

  • Topsoils lightly scarified prior to seeding.

  • Areas of subsidence repaired following reinstatement.

Additional Comments

  • Comments

Corrective Actions

Corrective Actions:

    Corrective Action:
  • ROW ID:

  • Chainage:

  • General Observation:

  • Photo:

  • Action Assigned To:

  • Action Type:

  • Action Required:

  • Action Required:

  • Action Required:

  • Action Required:

  • Action Required:

Photos

Photos:

    Photo
  • Photo Description:

  • Add media

Comments

Additional Comments:

Signature:

  • Position Title:

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.