Information
-
Conducted on
-
Phase
- 1 - Pinetown Line
- 2 - Rossburgh CTC
- 3A - KwaMashu
- 3B - Springfield
- 4 - Umlazi to Umbogintwinin
- 5 - Clairwood to Crossmoor
- 6 - Berea to Congella
- 7 - Durban
-
Station
- Pinetown
- Sarnia
- Northdene
- Malvern
- Bellair
- Rossburgh
- Umbilo
-
Rossburgh CTC
-
Station
- KwaMashu
- Tembalihle
- Bridge City
- Duffs Road
- Effingham
- Kenville
- Temple
- Temple
-
Station
-
Station
-
Station
- Clairwood
- Montclair
- Merebank
- Havenside
- Westcliff
- Crossmoor
-
Station
-
Durban
-
Prepared by
-
Document No.
Key Milestones
-
Select Workstream
- WS01-Signalling
- WS02-Telecomms
- WS03-Trackwork
- WS04-Mains & OHTE
- WS05-Signalling Power Supply
- WS06-Civil
-
Milestone Status
Milestone
-
Milestone Description
-
Photo of Milestone Activity
Photo
-
Photo of Milestone Activity
-
What is the Due Date?
-
What is the status of this Milestone
Key Risks
-
Risk Identified
Risk
-
Risk Description
-
Photograph of Risk
Photo
-
Photographs of Risk
-
Station-Date-Position-Work stream-Event
-
Mitigation
-
Assigned to
Key Issues
-
Issues Identified
Issue
-
Issue Description
-
Photo of issue
-
Resolution
-
Assigned to
Materials on Site
-
Materials on Site
Material
-
Materials Description
-
Photo of Material on site
Photo
-
Photo of Material
Key Future Events
-
Key Events for Next Week
Event
-
Event Description
Conclusion
-
Project Schedule is:
-
BAA Site Representative Comments
-
BAA Site Representative Signature
-
TA Site Representative Comments
-
TA Site Representative Signature