Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Working at Heights

  • 1.1. Fall risks of 6' or more? (including voids, pits, and trenches)

  • 1.2. Lack of edge protection?

  • 1.3. Unsafe or incomplete edge protection?

2. Equipment

  • 2.1. Unsafe or damaged equipment? (including missing or damaged guards)

  • 2.2. Incorrect equipment for job? (e.g. grinding discs for cutting)

  • 2.3. Unsafe or incompatible attachments used with plant/equipment?

  • 2.4. Unlicensed operators?

  • 2.5. Lack of safe work instructions?

  • 2.6. Lack of training in safe operation, clean-up and maintenance?

  • 2.7. Lack of LOTO procedures for cleaning, servicing and maintenance?

  • 2.8 All generators/welders properly positioned and ventilated?

  • 2.9 Safety pins in place at pneumatic connections

3. Scaffolds

  • 3.1. Competent persons erecting scaffold above 4m?

  • 3.2. Unsafe or incomplete scaffold?

  • 3.3. Lack of inspection protocol for scaffold?

  • 3.4. Incompatible scaffold components? Unlabelled or do not meet AS?

  • 3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)

  • 3.6. Top rail between 39" & 45"?

  • 3.7. Mid rail between top rail and working surface. No opening greater than 19"?

  • 3.8. Toe Board installed to prevent falling objects?

  • 3.9. Can top rail support 200lbs, mid rail 150lbs?

  • 3.10. Posts not spaced more than 8' o/c?

4. Lifting Equipment

  • 4.1. Unsafe or damaged equipment, rigging slings?

  • 4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?

  • 4.3. Lack of maintenance, testing and inspection?

  • 4.4. Lack of SWL information displayed?

  • 4.5. Lack of daily inspection protocol?

  • 4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?

  • 4.7. Lifting equipment unlabelled, does not meet AS, no SWL displayed?

  • 4.8. Unlicensed operators?

  • 4.9. Lack of LOTO procedures for cleaning, servicing and maintenance?

  • 4.10. SWL of any lifting equipment exceeded?

5. Harness and Equipment

  • 5.1. Unsafe or damaged harness or equipment?

  • 5.2. Incompatible hooks/equipment?

  • 5.3. Unlabelled or does not meet AS?

  • 5.4. Unsafe or uncertified anchor points?

  • 5.5. Lack of inspection protocol for equipment?

  • 5.6. Lack of or inadequate formal training for operators?

6. Ladders

  • 6.1. Unsafe or damaged ladders?

  • 6.2. Unsafe positioning of ladders? 4'-1'?<br>

  • 6.3. Ladder not properly secured? 3' over or independent securement system?

  • 6.4. Ladder unsuitable for job? (e.g. metal ladder used for electrical work)

7. Welding and Cutting

  • 7.1. Cylinders secured and caps in place when not in use?

  • 7.2. All compressed gas cylinders secured in upright position at all times?

  • 7.3. Torches inspected for leaks in shut off valves, couplings, and tip connections at the beginning of the shift?

  • 7.4. Employees performing cutting or welding are protected by masks, visors/shields, respirators, clothing and gloves if req'd?

  • 7.5. Confined space welding/cutting met with appropriate ventilation or airline respirators?

8. Hazardous Chemical (including fuel and oil)

  • 8.1. Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)

  • 8.2. Incompatible chemicals stored near each other?

  • 8.3. Inadequate spill containment equipment?

  • 8.4. Safety Data Sheets accessible on site?

  • 8.5. Lack of emergency procedures for injury/spills/fire etc?

  • 8.6. Excessive quantities stored on site or in vehicles?

  • 8.7. Insufficient ventilation?

  • 8.8. Insufficient, or incorrect, PPE?

  • 8.9. Unsuitable storage containers? (unlabeled or stored in food containers)

9. Emergency Response

  • 9.1. Lack of, or no emergency plans for site?

  • 9.2. Emergency procedures displayed at site?

  • 9.3. Lack of training and rehearsal of emergency plans?

  • 9.4. Lack of, or inadequate first aid kits?

  • 9.5. Insufficient access to formally trained First Aiders for all shifts?

  • 9.6. Unsuitable or inadequate communication equipment?

10. Traffic Management

  • 10.1. Lack of, or inadequate, Traffic Management Plan (TMP) in place?

  • 10.2. Lack of training in TMP for all persons on site? <br>(contractors and visitors)

  • 10.3. Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)

  • 10.4. Emergency vehicle in place?

  • 10.5. All work contained to the closure?

11. Personal Protective Equipment (PPE)

  • 11.1. Hard hats?

  • 11.2. Reflective vests, class 3 if adjacent to 50 mph roads.

  • 11.3. 100% eye protection when on site?

  • 11.4. Hand and foot protection as required in Health and Safety Plan.

  • 11.5. Appropriate respirators in use?

  • 11.6. Safety Harness or fall protection used when a fall exists?

  • 11.7. Hearing protection used when necessary?

  • 11.8. Hand and eye wash stations in place when working with haz-mat?

12. Work Environment

  • 12.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)

  • 12.2. Insufficient lighting?

  • 12.3. Inadequate housekeeping?

  • 12.4. Lack of, or inadequate noise/ vibration control?

13. Electrical Hazards

  • 13.1. Unsafe electrical leads? (damaged, missing grounds, tears in insulation)?

  • 13.2. GFCI protected outlets?

  • 13.3. Contact with underground utilities?

  • 13.4. Contact with overhead electrical lines?

  • 13.5. Overloading outlets?

  • 13.6. Leads placed on ground or on metal structures?

  • 13.7. Electrical equipment near water?

  • 13.8. Electrical equipment near flammables?

  • 13.9. Electrical equipment near chemicals that could cause damage?

  • 13.10. Electrical leads that may be damaged from contact with moving machinery parts?

  • 13.11. Electrical leads on work surfaces?

  • 13.12. Lack of Lock-out/tag-out (LOTO) procedures for electrical equipment?

14. Environmental Hazards

  • 14.1. Lack of/or inadequate Environmental Management plan (EMP)?

  • 14.3. Systems in place to prevent contaminants entering stormwater drains?

15. Administrative Procedures

  • 15.1. Lack of/or inadequate Site Safety Plan?

  • 15.2. Failure to obtain permits (Council, EPA, WHS, also Hot Works, Confined Space etc)

  • 15.3. Lack of, or inadequate, induction for workers, contractors, visitors?

  • 15.4. Lack or, or inadequate, supervisory arrangements?

  • 15.5. Lack of/or inadequate training, licenses, skills, experience?

  • 15.6. Lack of/or inadequate Safe Work Method Statements (SWSM) for high- risk work?

  • 15.7. Lack of, or inadequate system to review SWMS as needed?

  • 15.8. Lack of/or inadequate incident notification procedures?

  • 15.9. Lack of, or inadequate, routine inspections, monitoring, audits?

  • 15.10. Lack of/or inadequate consultative arrangements?

Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.