Title Page
-
Project
-
Date of Inspection
-
Inspected by
-
Area(s) Inspected
-
Weather
Access
-
clear of obstructions, overhead protection where required, delineation where required, separation of people & plant, ladders, stairs, etc.
-
To and from worksite
-
To working decks, catch decks, work platforms
-
Lighting where required
Plant and Equipment
-
Plant and Equipment Register in date
Electrical
-
Portable equipment tested, tagged and in date
-
Electrical leads elevated by use of stands/hooks
Plant
-
Log book/daily pre-start completed
-
Fire extinguishers in place where required
-
Operators current certificates of competency
-
High Risk Work License expiry date within 5 years
-
High Risk Works as per SWMS
Formwork
Horizontal Elements
-
Handrail System in place and fixed.
-
Kickboards in place
-
Catch decks in place below where required
-
"Formworkers Only" signage in place
-
Penetrations - solid covers fixed down, mesh in place, signage in place/sprayed with "PENO"
-
Penetrations - timbers underneath to provide adequate support for both during and after cutting
-
LVL (timber planks) /Wexdex/ Ischebek panels visually inspected for damage/defects?
-
Formwork Handover checklist completed between trades (where appropriate)
-
High Risk Works as per SWMS
Formwork Stripping
-
Sign off in place prior to commencing stripping
-
Exclusion zones with signage in place
-
Works undertaken progressively
-
Workers using minimum 2 planks as platform
-
Task lighting in place
-
Access maintained throughout stripping works
-
Materials stacked; timbers de-nailed
Jumpform
-
Pre and Post Climbing Safety Inspection Checklist from previous climb signed off
-
Access to Jumpform
-
"Formworkers Only" signage in place
-
Ladders tied and secured top & bottom
-
Housekeeping (clear of debris)
-
All electrical leads elevated
-
Lifting equipment tested and tagged, and lifting register up to date
-
Spill kit available (hydraulic only)
-
Fire extinguishers available on deck and cells
-
Amenities available (toilet, water bubbler)
-
Stretcher available on deck
-
All workers are trained in rescue plan
-
Nurse call kept clear at all times of materials
-
Hatches have handrails (top & mid) in place
-
Hatch is kept closed with chain across it at all times
-
Reo bars are all capped off
-
No gaps, with mesh in place and secured
-
Lighting in place where required
-
Handrails in place when working off Platform?
-
No gaps between bottom platform and concrete wall, Cover Strip secure?
Screens
-
Pre and Post Climbing Safety Inspection Checklist from previous climb signed off
-
All platforms clear of materials
-
Check spacing between screens (max <50mm gaps)
-
Check all flaps/rubbers in place and secured
-
Check bottom trailing deck has no gaps - completely sealed
-
Exclusion zones and physical barriers in place at all relevant levels
-
Check height of top screen is adequate for edge protection
Scaffold
-
Handrails (top & mid) in place and compliant
-
Kickboards/Hop ups in place
-
Gaps under 225mm
-
Signage in place for exclusion or incomplete scaffold where required
-
Is scaffold tag in place and in date (within 30 days)
-
Tool Lanyards being used/ Material tethers present (if required)
-
PPE being worn, chin straps for edge works, gloves, glasses, hearing protection for noisy works
-
Workers working of fully planked bays?
-
Shade and Chain installed where required?
-
Scaffold components fixed, secure and installed as per Installation Guides?
-
Scaffold works over 4m being built to engineered approved certified design?
-
Ladders have been secured top & bottom - 1:4 ratio (1m past the top)
-
Scaffold Handover has been complete and signed off?
-
Scaffold Inspection has been complete and saved on OneDrive?
-
High Risk Works as per SWMS
General
-
Housekeeping progressively maintained
-
Materials handling monitored and effective
-
Glasses, gloves, hearting protection and face shields where required, are worn and in good condition
-
Adequate supply of PPE at site office
-
Permits to work in place where required e.g. exclusion zone, hot works, working at height.
-
Ladders secured top and bottom, 1:4 ratio (1m past the top)
-
SDS available and complied with, chemicals stored in appropriate place?
-
Concrete wash out compliant with environmental controls
-
Pre-starts and toolboxes conducted and uploaded onto builder server/internal folder
Silica Dust Management
-
Exposed Worker has appropriate RPE?
-
Exposed Worker is wearing RPE?
-
Supression tools present and being used?
-
Do powertools have attachments for dust exctraction if appropriate?
-
Workers are using H-Class Vacuums for housekeeping activities?
-
Exclusion Zone established for Patching works(if required)?
-
RCS Logbooks are being completed Per Task?
Sign off
-