Title Page

  • Project

  • Date of Inspection

  • Inspected by

  • Area(s) Inspected

  • Weather

Access

  • clear of obstructions, overhead protection where required, delineation where required, separation of people & plant, ladders, stairs, etc.

  • To and from worksite

  • To working decks, catch decks, work platforms

  • Lighting where required

Plant and Equipment

  • Plant and Equipment Register in date

Electrical

  • Portable equipment tested, tagged and in date

  • Electrical leads elevated by use of stands/hooks

Plant

  • Log book/daily pre-start completed

  • Fire extinguishers in place where required

  • Operators current verification of competency

  • High Risk Work License expiry date within 5 years

  • High Risk Works as per SWMS

Formwork

Horizontal Elements

  • Handrail System in place and fixed.

  • Kickboards in place

  • Catch decks in place below where required and handover completed

  • "Formworkers Only" signage in place

  • Penetrations - solid covers fixed down, mesh in place, signage in place/sprayed with "PENO"

  • Penetrations - timbers underneath to provide adequate support for both during and after cutting

  • LVL (timber planks) /Wexdex/ Ischebek panels visually inspected for damage/defects?

  • Formwork Handover checklist completed between trades (where appropriate)

  • High Risk Works as per SWMS

Vertical Elements

  • Safe Access system has been provided to install shutters?

  • Exclusion Zone has been set up around work area?

  • Shutter Lifting Points/Equipment are certified and tagged?

Formwork Stripping

  • Sign off in place prior to commencing stripping

  • Exclusion zones with signage in place

  • Works undertaken progressively

  • Workers using minimum 2 planks as platform

  • Task lighting in place

  • Access maintained throughout stripping works

  • Materials stacked; timbers de-nailed

Screens

  • Pre and Post Climbing Safety Inspection Checklist from previous climb signed off

  • All platforms clear of materials

  • Check spacing between screens (max <50mm gaps)

  • Check all flaps/rubbers in place and secured

  • Check bottom trailing deck has no gaps - completely sealed

  • Exclusion zones and physical barriers in place at all relevant levels

  • Check height of top screen is adequate for edge protection

General

  • Housekeeping progressively maintained

  • Materials handling monitored and effective

  • Glasses, gloves, hearting protection and face shields where required, are worn and in good condition

  • Adequate supply of PPE at site office

  • Permits to work in place where required e.g. exclusion zone, hot works, working at height.

  • Ladders secured top and bottom, 1:4 ratio (1m past the top)

  • SDS available and complied with, chemicals stored in appropriate place?

  • Pre-starts and toolboxes conducted and uploaded onto builder server/internal folder

  • HSR is completing Daily Checklist

  • HSR is completing Weekly Submission Checklist

Silica Dust Management

  • Exposed Worker has appropriate RPE?

  • Exposed Worker is wearing RPE?

  • Supression tools present and being used?

  • Do powertools have attachments for dust exctraction if appropriate?

  • Workers are using H-Class Vacuums for housekeeping activities?

  • Exclusion Zone established for Patching works(if required)?

  • RCS Logbooks are being completed Per Task?

Sign off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.