Title Page

  • Project

  • Date of Inspection

  • Inspected by

  • Area(s) Inspected

  • Weather

Access

  • clear of obstructions, overhead protection where required, delineation where required, separation of people & plant, ladders, stairs, etc.

  • To and from worksite

  • To working decks, catch decks, work platforms

  • Formwork hoist checklist signed off

  • Lighting where required

Plant and Equipment

  • Plant and Equipment Register in date

Electrical

  • Portable equipment tested, tagged and in date

  • TBD's supplied, 30m radius, spider boards to deck

  • Earth Leakage Supplied (RCD)

  • Electrical leads elevated by use of stands/hooks

Plant

  • registration documents include RMS, WorkCover & Client/Site specific where applicable

  • All registrations in place

  • Log book/daily pre-start completed

  • Maintenance records available

  • Fire extinguishers in place where required

  • Operators current certificates of competency

  • High Risk Work License expiry date within 5 years

  • Exclusion zones in place where required (e.g. no work under boom)

  • High Risk Works as per SWMS

Hot Works

  • Oxy/Act Equipment compliant i.e. secured in trolley, flash back arrestors on both ends of hose

  • Fire extinguisher in place

  • Welding screens in place where required

  • Hot Works Permit in place where required

Formwork

Horizontal Elements

  • Handrail System in place and secure.

  • Kickboards in place

  • Catch decks in place below where required

  • "Formworkers Only" signage in place

  • Penetrations - solid covers fixed down, mesh in place, signage in place/sprayed with "PENO"

  • Penetrations - timbers underneath to provide adequate support for both during and after cutting

  • LVL (timber planks) /Wexdex/ Ischebek panels visually inspected for damage/defects?

  • Formwork/Falsework Engineer Certificate in place

  • Formwork Handover checklist completed between trades (where appropriate)

  • Where scaffold is edge protection, gaps are <225mm

  • High Risk Works as per SWMS

Vertical Elements

  • Safe Access system has been provided to install shutters?

  • Exclusion Zone has been set up around work area?

  • Shutter Lifting Points/Equipment are certified and tagged?

Formwork Stripping

  • Sign off in place prior to commencing stripping

  • Exclusion zones with signage in place

  • Works undertaken progressively

  • Workers using minimum 2 planks as platform

  • Task lighting in place

  • Access maintained throughout stripping works

  • Materials stacked; timbers de-nailed

Crane-Liftable Box

  • Pre and Post Climbing Safety Inspection Checklist from previous climb signed off

  • Access to Decks

  • "Formworkers Only" signage in place

  • Ladders tied and secured top & bottom

  • Housekeeping (clear of debris)

  • All electrical leads elevated

  • Lifting equipment tested and tagged, and lifting register up to date

  • Fire extinguishers available on deck and cells

  • Rescue Equipment provided for works?

  • All workers are trained in rescue plan

  • Hatches have handrails (top & mid) in place

  • Hatch is kept closed with chain across it at all times

  • Reo bars are all capped off

  • Lighting in place where required

General

  • Housekeeping progressively maintained

  • Materials handling monitored and effective

  • Glasses, gloves, hearting protection and face shields where required, are worn and in good condition

  • Adequate supply of PPE at site office

  • Permits to work in place where required e.g. exclusion zone, concrete pumping, hot works, working at height (builder specific)

  • Ladders secured top and bottom, 1:4 ratio (1m past the top)

  • SDS available and complied with, chemicals stored in appropriate place?

  • Concrete wash out compliant with environmental controls

  • Pre-starts and toolboxes conducted and uploaded onto builder server/internal folder

CSS controls

  • Patchers have appropriate equipment and PPE?

  • Supression tools present and being used?

  • Do powertools have attachments for dust exctraction if appropriate?

Sign off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.