Title Page
-
Project
-
Date of Inspection
-
Inspected by
-
Area(s) Inspected
-
Weather
Access
-
clear of obstructions, overhead protection where required, delineation where required, separation of people & plant, ladders, stairs, etc.
-
To and from worksite
-
To working decks, catch decks, work platforms
-
Formwork hoist checklist signed off
-
Lighting where required
Plant and Equipment
-
Plant and Equipment Register in date
Electrical
-
Portable equipment tested, tagged and in date
-
TBD's supplied, 30m radius, spider boards to deck
-
Earth Leakage Supplied (RCD)
-
Electrical leads elevated by use of stands/hooks
Plant
-
registration documents include RMS, WorkCover & Client/Site specific where applicable
-
All registrations in place
-
Log book/daily pre-start completed
-
Maintenance records available
-
Fire extinguishers in place where required
-
Operators current certificates of competency
-
High Risk Work License expiry date within 5 years
-
Exclusion zones in place where required (e.g. no work under boom)
-
High Risk Works as per SWMS
Hot Works
-
Oxy/Act Equipment compliant i.e. secured in trolley, flash back arrestors on both ends of hose
-
Fire extinguisher in place
-
Welding screens in place where required
-
Hot Works Permit in place where required
Formwork
Horizontal Elements
-
Handrail System in place and secure.
-
Kickboards in place
-
Catch decks in place below where required
-
"Formworkers Only" signage in place
-
Penetrations - solid covers fixed down, mesh in place, signage in place/sprayed with "PENO"
-
Penetrations - timbers underneath to provide adequate support for both during and after cutting
-
LVL (timber planks) /Wexdex/ Ischebek panels visually inspected for damage/defects?
-
Formwork/Falsework Engineer Certificate in place
-
Formwork Handover checklist completed between trades (where appropriate)
-
Where scaffold is edge protection, gaps are <225mm
-
High Risk Works as per SWMS
Vertical Elements
-
Safe Access system has been provided to install shutters?
-
Exclusion Zone has been set up around work area?
-
Shutter Lifting Points/Equipment are certified and tagged?
Formwork Stripping
-
Sign off in place prior to commencing stripping
-
Exclusion zones with signage in place
-
Works undertaken progressively
-
Workers using minimum 2 planks as platform
-
Task lighting in place
-
Access maintained throughout stripping works
-
Materials stacked; timbers de-nailed
Crane-Liftable Box
-
Pre and Post Climbing Safety Inspection Checklist from previous climb signed off
-
Access to Decks
-
"Formworkers Only" signage in place
-
Ladders tied and secured top & bottom
-
Housekeeping (clear of debris)
-
All electrical leads elevated
-
Lifting equipment tested and tagged, and lifting register up to date
-
Fire extinguishers available on deck and cells
-
Rescue Equipment provided for works?
-
All workers are trained in rescue plan
-
Hatches have handrails (top & mid) in place
-
Hatch is kept closed with chain across it at all times
-
Reo bars are all capped off
-
Lighting in place where required
General
-
Housekeeping progressively maintained
-
Materials handling monitored and effective
-
Glasses, gloves, hearting protection and face shields where required, are worn and in good condition
-
Adequate supply of PPE at site office
-
Permits to work in place where required e.g. exclusion zone, concrete pumping, hot works, working at height (builder specific)
-
Ladders secured top and bottom, 1:4 ratio (1m past the top)
-
SDS available and complied with, chemicals stored in appropriate place?
-
Concrete wash out compliant with environmental controls
-
Pre-starts and toolboxes conducted and uploaded onto builder server/internal folder
CSS controls
-
Patchers have appropriate equipment and PPE?
-
Supression tools present and being used?
-
Do powertools have attachments for dust exctraction if appropriate?
Sign off
-
Add signature