Title Page
Site Log
-
Project Name
-
Site Name
-
Site Location
-
Contractor Name
-
Sub-Contractor Name "if applicable"
-
Conducted on
-
Prepared by
General
-
What is the nature of the shutdown
-
Other: provide detail
-
Expected Shutdown duration:
Site Entry and Security
-
Has the site been secured?
-
Has security been arranged for the shutdown duration?
-
Has a 24hour contact person been nominated and details displayed on site?
-
Evidence/ Comments
Waste Management
-
Has regular waste collection services been notified and/or cancelled?
-
Has all waste been removed from site?
-
Are all liquids stored in secure, covered and bunded areas?
-
Are all skip bins left empty and secured where possible and covered if required?
-
Evidence/ Comments
Soil and Water
-
Are all erosion control devices at maximum capacity and additional controls installed where required?
-
Have all stockpiles been covered or relocated away from sensitive receivers?
-
Have all exposed areas been covered and stabilised?
-
Is monitoring required following heavy rain events? If so, provide details
-
Is there flood management protection in place?
-
Have all drainage lines and stormwater channels been protected from erosion?
-
Evidence/ Comments
Plant & Equipment
-
Have all items been removed or relocated as necessary to an appropriate location?
-
Have all plant/equipment deliveries been cancelled?
-
Evidence/ Comments
Recommendation to Project Manager
-
The condition of the site is:
-
Details of further work required (if not included above)