Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

GC AND SUPERINTENDENT NAME

SPECIFIC AREA(S) INSPECTED

PERSONAL PROTECTIVE EQUIPMENT

  • Hard hats (with bills forward)

  • Safety glasses with side shields

  • Leather work boots

  • Reflective vests

  • Gloves

  • Hearing protection

  • Face shields

  • Burning goggles

  • Welding hood and gloves

HOUSEKEEPING

  • Material stacked orderly

  • Trash cans in work area

  • Debris properly removed

  • Cords and hoses off the floor

  • Access maintained

TEMPORARY BARRICADES

  • Proper tape used (red for danger, yellow for caution)

  • All sides of work area barricaded

  • Barricade removed or properly disposed of

ELECTRICAL

  • Cords checked for damage

  • Third prong on cords

  • GFCI working

LADDERS AND SCAFFOLDING

  • Ladders tied off

  • Ladder extended 3'

  • Stepladders in open position

  • Inspected and tagged

  • Components undamaged

  • Handrail in place

  • Ladder access

  • Sections properly pinned

  • Planking secured

FALL PROTECTION

  • Guardrail system checked

  • Harness and lanyards checked

  • Horizontal lifeline checked

  • Floor openings covered

  • Roof opening guarded

  • Wall openings guarded

  • Blue fencing up

  • Netting checked

MOBILE EQUIPMENT

  • Seatbelts used

  • Workers trained

  • Equipment inspected

  • Backup alarms working

  • Spotters used when needed

HOISTING AND RIGGING EQUIPMENT

  • Daily crane inspection performed

  • 1 eye per hook

  • Sling/chokers stored

  • Qualified rigger named

  • Safety latch on hook checked

  • Cranes flagged off

  • Slings/chokers insoected

  • Lift zone designated

  • Knowledge of crane signals

EXCAVATION

  • Competent person named

  • Shore/slope/bench

  • Excavation checked daily

  • Proper access/egress

  • Spoil pile at least 2' from edge

  • Workers trained

PREWORK

  • Daily Project EHS Inspections are being conducted and inspection sheets are available for review

  • IFE postings and other EHS Postings are in place for the workers on the Project

  • Safe Work Plan was communicated to all workers on the project as a Toolbox Talk (Sign-in sheets are on site and available for review)

  • Weekly EHS Toolbox Talks are relevant to the Project, and sign-in sheets are onsite available for review

  • Daily Pre-Task Safety Plans for each sub-contractor have been reviewed and signed by sub-contractor employees and the GC Superintendent

  • Daily Pre-Task Safety Plans for the GC and all sub-contractors are are onsite available for review

  • MSDS for all chemicals on the project are onsite available for review

  • Preconstruction Safety Meeting was conducted for the Project

  • Safe Work Plan is available for review and completed with all required MOP's, Permits and risk assessments.

  • All required permits obtained, posted and dated properly.

  • UGL LOTO or UOME first lock/tag on and last lock/tag off

  • First Aid Kit is on site, in a sanitary condition and available for all workers on the Project

  • Employee training records are available for work being performed

  • 36" minimum emergency egress requirement and uninstructed access to emergency equipment (fire extinguishers, pull stations, eyewash stations) is maintained

COMMENTS

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.