Pre-Work

  • Pre Task Plan communicated, understood and signed by each worker?

  • Pre Task Plan posted in conspicuous place at work site?

  • Workers physically ready for work?

  • MSDS Sheets obtained and available?

  • All required permits obtained?

  • Lockout/Tagout performed?

  • All training completed for work to be performed?

Personal Protective Equipment

  • Hardhat bills forward?

  • Face shields

  • Gloves

  • Safety glasses with side shields

  • Burning goggles

  • Hearing Protection

  • Leather Work Boots

  • Welding Hood & Gloves

  • Reflective Vest

Fall Protection (100% Fall Protection Required at six feet or greater)

  • Guardrail System Checked

  • Floor Openings Covered

  • Blue Fence Up

  • Harness and Lanyard Checked

  • Roof Openings Guarded

  • Netting Checked

  • Horizontal Lifeline Checked

  • Wall Openings Guarded

Ladders & Scaffold

  • Ladder Tied Off

  • Scaffold Inspected & Tagged

  • Ladder Access

  • Ladder Extended Three Feet

  • Sections Properly Pinned

  • Handrail In Place

  • Step Ladders In Open Position

  • Components Not Damaged

  • Planking Secured

Housekeeping

  • Material Stacked & Orderly

  • Cords & Hoses Off Floor

  • Trash Cans In Work Area

  • Access Maintained

  • Debris Removed

Hoisting & Rigging Equipment

  • Daily Crane Inspection

  • Qualified Rigger Named

  • Slings & Chokers Inspected

  • One-eye per Hook

  • Safety Latch on Hook Checked

  • Knowledge of Crane Signals

  • Sling/Chokers Stored

  • Cranes Flagged Off

  • Lift Zone Designated

Mobile Equipment

  • Seatbelts Used

  • Backup Alarms Working

  • Workers Trained

  • Spotters used when needed

  • Equipment Inspected

Excavations

  • Competent Person Named

  • Proper Access / Egress

  • Shores / Shield / Slope / Bench

  • Spoil Pile 2' From Edge

  • Excavation Checked Daily

  • Workers Trained

Temporary Barricades

  • Proper Tape Used (Red-Danger, Yellow-Caution)

  • All Sides Barricaded

  • Barricade Removed or Disposed of Properly

  • Temporary Walls in Good Condition & Maintained

  • HEPA filtration on and maintained

  • Negative pressure of -0.02 achieved

Electrical

  • Cords Check for Damage

  • Current Quarterly Inspection Color on Cords

ILSM Measures

  • Fire Extinguishers Inspected Monthly

  • Fire Extinguishers charged and pins installed

  • ILSM signage in place

  • Fire Strobes visible and functional

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.