Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Superintendent's Name: Justin DeGan
Specific Area(s) Inspected: Kaiser Sustaining
Pre-Work
-
Pre Task Plan communicated, understood and signed by each worker?
-
Pre Task Plan posted in conspicuous place at work site?
-
Workers physically ready for work?
-
MSDS Sheets obtained and available?
-
All required permits obtained?
-
Lockout/Tagout performed?
-
All training completed for work to be performed?
Personal Protective Equipment
-
Hardhat bills forward?
-
Face shields
-
Gloves
-
Safety glasses with side shields
-
Burning goggles
-
Hearing Protection
-
Leather Work Boots
-
Welding Hood & Gloves
-
Reflective Vest
Fall Protection (100% Fall Protection Required at six feet or greater)
-
Guardrail System Checked
-
Floor Openings Covered
-
Blue Fence Up
-
Harness and Lanyard Checked
-
Roof Openings Guarded
-
Netting Checked
-
Horizontal Lifeline Checked
-
Wall Openings Guarded
Ladders & Scaffold
-
Ladder Tied Off
-
Scaffold Inspected & Tagged
-
Ladder Access
-
Ladder Extended Three Feet
-
Sections Properly Pinned
-
Handrail In Place
-
Step Ladders In Open Position
-
Components Not Damaged
-
Planking Secured
Housekeeping
-
Material Stacked & Orderly
-
Cords & Hoses Off Floor
-
Trash Cans In Work Area
-
Access Maintained
-
Debris Removed
Hoisting & Rigging Equipment
-
Daily Crane Inspection
-
Qualified Rigger Named
-
Slings & Chokers Inspected
-
One-eye per Hook
-
Safety Latch on Hook Checked
-
Knowledge of Crane Signals
-
Sling/Chokers Stored
-
Cranes Flagged Off
-
Lift Zone Designated
Mobile Equipment
-
Seatbelts Used
-
Backup Alarms Working
-
Workers Trained
-
Spotters used when needed
-
Equipment Inspected
Excavations
-
Competent Person Named
-
Proper Access / Egress
-
Shores / Shield / Slope / Bench
-
Spoil Pile 2' From Edge
-
Excavation Checked Daily
-
Workers Trained
Temporary Barricades
-
Proper Tape Used (Red-Danger, Yellow-Caution)
-
All Sides Barricaded
-
Barricade Removed or Disposed of Properly
-
Temporary Walls in Good Condition & Maintained
-
HEPA filtration on and maintained
-
Negative pressure of -0.02 achieved
Electrical
-
Cords Check for Damage
-
Current Quarterly Inspection Color on Cords
ILSM Measures
-
Fire Extinguishers Inspected Monthly
-
Fire Extinguishers charged and pins installed
-
ILSM signage in place
-
Fire Strobes visible and functional