Title Page

  • Conducted on

  • Prepared by

Assessment of task

  • What Project are you visiting

  • Who is the area supervisor for the project crew

  • Are span of control sufficient for the task being performed

  • Are JHAs in place for all tasks and are located on the job site

  • Have JHAs for previous days been checked and signed by both the user and BHP responsible person

  • Have you viewed any Take5’s for the project

  • Used for general notes

Personnel

Occupational health

  • Where applicable, are dust controls needed for the project

  • Is the control in place, water suppression on roadways/civil operations?

  • Is the control in place, PPE, if so, is the PPE being used/fitted correctly?

  • Where applicable, are noise controls needed for the project

  • Are those controls administrative eg. rotating tasks, etc?

  • Are the controls PPE and are they being used/fitted correctly?

  • Where applicable, are there any other occupational hazards that need to be considered and controlled (eg. radiation)

  • Used for general notes

Hazardous substances

  • If applicable, are any chemicals being used?

  • Is PPE being used and chemical being used for the intended purpose

  • Storage of chemicals sufficient (bundled, etc)

  • Used for general notes

General area

House keeping

  • Area clean and tidy, bins available and emptied regularly

  • Are work area suitable for the task (Roads in good condition, pathways and areas free of trip hazards, etc)

  • Is there a smoking area available and away from buildings Has it got sufficient butt controls (butt bins or sand buckets) Are general waste bins away from the smoking area

  • Is there drop mats in place for elevated areas to control housekeeping issues

  • Used for general notes

Waste storage

  • Where applicable, is there the need for storage areas and are they managed correctly

  • Items being disposed of in correct locations (hydrocarbon waste, general, etc)

  • Used for general notes

Safe work practices

  • General PPE<br>Where applicable, are PPE controls sufficient for the risk present, if not, detail specific risks and controls needed as well as any actions

  • Banned tooling<br>Where applicable, are all tooling safe to use, if not detail the banned/at risk tooling and any corrective actions required

  • WAH PPE<br>Where applicable, is fall arrest equipment (Harnesses, lanyards, etc) in date, fitted correctly and fit for purpose. If not, detail specific gaps and any corrective actions required

  • Where applicable, is the communication effective for the task (Radio channels appropriate for the area)

  • When applicable, is there sufficient lighting to perform the task

  • Where applicable, are drop mats and/or tool lanyards in place for elevated working environments to control the potential for drop objects, if not, detail the risk/controls needed including any follow up actions that maybe required

  • Used for general notes

Deliniation

  • Is there enough signage present for the task

  • Where applicable, is there a need for a TMP for the project, if so has it been authorised and distributed?

  • Is the TMP on the job site and/or does the work crew understand them

  • Where applicable, does the current barricading at the work front control all hazards?

  • Are windrows in place where needed and of sufficient size

  • Is hard barricading in use and closing all entries

  • Is soft barricading correct for the control (Danger verse Caution verse ECO)

  • Have info tags been used and spaced maximum 6m apart

  • Used for general notes

Ground control

  • Where applicable, are Primary stand-off controls in place when needed (5m limits) with barricading/ windrows, etc

  • Where applicable, are ground conditions suitable (compacted for cranes, no cracking in benches or civil areas, etc)

  • Used for general notes

Records

Permits

  • Have you reviewed or sighted the project PTW

  • Is the PTW available on the job site

  • What is the title on the PTW (If more than one sighted, list all)

  • Has the PTW been signed over if the supervisor has changed (This is applicable for both the holder and the authoriser)

  • Where applicable, is an excavation permit required for the project, if so is the permit current?

  • Is there copy on the job site

  • Where applicable, is there a PEAHR required for the project, if so, is the permit current?

  • Is there copy on the job site

  • Where applicable, is a HV permit required for the project, if so is the permit current?

  • Is it an access permit

  • Is it a corridor permit

  • Is there copy on the job site

  • Where applicable, is any other permit/s required for the project, if so is the permit current?

  • Is it a hot work permit

  • Is it a working at height permit

  • Is it a confined space permit

  • Other permit

  • Used for general notes

Electrical documentation

  • Electrical installations:<br>Where applicable, is the project an electrical installing task and work being carried out today?

  • This is a mandatory requirement. Have they got their licence on them (take photo) or are they able to locate at short notice, if so, is it a WA licence and in date

  • Licences have been entered into area log book (only check once)

  • Where applicable, take a small sample of the area electrical appliances and check for the correct test tags in date, raise actions as required if gaps found

  • Where applicable, are work groups using elevated stands in the work area and RCD boxes to control electrical leads and the electrical hazards that maybe present

  • Isolation:<br>Where applicable, are isolations needed for the project

  • Positive isolations in place for tasks needing isolations (pre starts, electrical work, etc)

  • Isolations are being confirmed and lock holders are placing their tags on the correct isolation point

  • Where applicable, is there a lock box in use for the project, have isolation lists been checked appropriate for the task being performed

  • Used for general notes

LV, SME, Plant compliance

  • Are pre start inspections been carried out on all equipment (lighting plants usually get missed)

  • If applicable, Is there any GET equipment being brought to site

  • Has a weed and seed inspection been completed

  • If applicable, Is there any GET equipment leaving site

  • Has a weed and seed inspection been completed

  • If applicable, Has any new FRCS equipment being brought to site

  • Are cranes or registered plant in use and do they have all their documentation (Check once only, FRCS compliance)

  • Used for general notes

Completion

  • This page is to acknowledge that the work place inspection has been completed Signing the inspection also acknowledges actions from the inspection have been assigned and recorded Sign and set audit to completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.