Information
OPERATION DETAILS
-
Office Name
-
Property Name
-
Compartment Number or Site Name
-
Location
-
Conducted on
-
Contract Checklist Number.
-
Operation (brief description)
-
Inspecting Manager' Name
-
For this operation does the Inspecting Manager require a BASIS or POWER certificate?
-
Initiating Manager's Name
-
Is this a certified property?
-
What is Scottish Woodlands managerial capacity?
- Landowner
- Forest Works Manager
- Contractor
- Sub Contractor
-
What is the work status?
-
In Progress - Work is proceeding as normal.
Completion - The job is finished and this is a final check before signing off the job.
Maintenance - There is no work ongoing as the contractor has stopped work to maintain machinery.
Suspended - Work has been stopped due to weather, serious non-compliance by contractor or other reason.
Contractor
CONTRACTOR
-
Contractor Name
-
Is the Contractor present on site?
-
Are they an approved Contractor on Capacity?
- Yes
- No
-
Site Safety Coordinator's Name
-
Is the Site Safety Coordinator present on site?
-
CONTRACT DOCUMENTATION<br>Is the Contract Checklist, Risk Assessment, Method Statements etc Available on site
Personnel
PERSONNEL
-
Do all operatives on site meet the following criteria?
-
Approved and on Capacity?
-
Suitably qualified?
-
Inducted to site?
-
Have available and are wearing the appropriate PPE?
-
Demonstrate a good professional attitude to their work?
-
Adopt good working practices?
-
Appear free from the influence of drugs and alcohol?
-
Are risk aware?
Welfare
WELFARE
-
Is there suitable communication on site?
-
Is there an appropriate First Aid kit on site?
-
Are there suitable washing and toilet facilities on site?
-
Is the Emergency Plan appropriate and up to date?
-
Are the Lone Working arrangements appropriate?
Environment
ENVIRONMENT
-
Is there adequate oil or chemical spill kits on site?
-
Are all oils, lubricants, fuels and pesticides stored in appropriate locked containers?
-
Is adequate provision of deadwood being made during harvesting operations?
-
Protected Species - Are these surveyed and have adequate provisions been made for their protection?
-
Protected Habitats - Are these adequately marked off and protected from silt etc?
-
Ground Damage - Is this within acceptable limits?
-
Are watercourses running clear and are they free from pollution?
-
Waste/litter Management - Is the site clear of waste and litter?
Equipment
EQUIPMENT
-
Are all pieces of machinery and equipment in good condition?
-
Fuel and oil systems in good order?
-
Is the machinery or equipment appropriate to the task in hand? Is it up to the job?
-
Are service areas clean and left in a safe condition?
-
Does all machinery have PUWER and LOLER records?
Site Management
SITE MANAGEMENT
-
Are Threshold Signs in place?
-
Is there appropriate on site safety signs?
-
Goal posts and ground level barriers - Are all power lines and other utilities properly identified and protected?
-
Hazard management measures - Are appropriate measures in place to control other site hazards?
-
Are any risk zones identified and marked? (Eg power line Red Zone)
-
Is the access road safe and in good condition and is there suitable and safe turning space?
-
Is the contractor adopting safe working practices and are these in line with agreed Method Statements?
-
Are timber stacks safe and within agreed working heights?
-
Work at height - Is this being carried out safely. (Harnesses etc)
-
Are any lifting and lowering operations being carried out safely and according to any agreed Lifting Plan?
-
Permit to Dig - Is there an approved permit to dig for any excavations and does it relate to the ongoing operation?
-
Are any other operations on the contract checklist not mentioned above being done safely?
Reporting Requirements
REPORTING REQUIREMENTS
-
Have there been any accidents, near misses or safety incidents that the contractor is obliged to report?
-
Have there been any environmental incidents?
Observations and corrective actions
Observations and Corrective Actions
-
Enter site observations here.
-
Add drawing if required.
-
Add photo if required.
-
Add Corrective Action
Corrective Action
-
Details of Corrective Action.
-
Severity of Corrective Action
-
CAPACITY CAR Number
-
Proposed Close out date.
-
OUTCOME OF INSPECTION
Additional Instructions
ADDITIONAL INSTRUCTION
-
Enter details of any additional instructions to the contractor here.
-
Add drawing if required.
Signing
-
Signed Inspecting Manager
-
Date
-
Signed Senior Manager
-
Date
-
Declaration by Contractor
I have read and understood the above and agree to carry out any necessary remedial or corrective actions and/or agree to the additional work identified. I understand that the above forms part of any contract with Scottish Woodlands Ltd. -
Signed Contractor
-
Date