Title Page
-
Document number
-
Site being inspected
-
Location
-
Conducted on
-
Person performing inspection
-
Team Leader
-
Team Members
-
Job task being performed
WHS Site Inspection
JSA, SWMS, Plant Checks review
-
Has a JSA been completed to manage the site-specific hazards?
-
Has the JSA been reviewed by the work crew preforming the works (signed onto)?
-
Have all hazards been identified & their risks managed in the JHA?
-
All workers including contractors have been inducted into the site?
-
Is a copy of the relevant SWMS available at the work & in date?
-
Has the SWMS been reviewed by the crew performing works (signed onto)?
-
Where required contractors have signed onto MCC SWMS & JHA?
-
Contractors have completed their JSA, SWMS?
-
Any further comments
Plant, Portable Equipment review
-
Plant pre-starts have been completed?
-
Contractors have completed their plant pre-start checks?
-
Workers have appropriate licences & competences?
-
All electrical equipment have current test & tags?
-
Warning lights, audible warning devices are operating?
-
Are trainee operators maintaining logbooks?
-
WLL (working load limit) are displayed on all plant is legible?
-
All plant has a 'beware of overhead power electrical hazards' or 'lookup & live' stickers?
-
Chains are being used to secure plant to plant trailers?
-
Are plant load restraints fit for purpose?
-
Plant loaded on trailers have been suitably cleaned prior to being transported, i.e., tracks are not dirty, no loose rocks etc.?
-
Portable plant & equipment is in good order - guards are in place – no visible oil leaks etc.?
-
Plant & other equipment carried in utility trays, trailers are adequately restrained to prevent movement?
-
Has the JSA been reviewed the works (signed onto)?
-
Electrical leads are placed to avoid damage?<br>i.e., Not lying on ground etc.
-
Ladder are fit for purpose, setup correctly & industrial rated for correct weight of worker?
-
Are 3 points of contact is being maintained when working from a ladder?
-
Any further comments?
Traffic Control, Excavations, Site Establishment review
-
Is appropriate TCP selected & implemented – signage is correct? (record TCP Number)
-
Placement of signage provides adequate advanced warning of hazards / requirements? (Side roads to be checked as well)
-
Are traffic controllers placed to ensure their safety?
-
After care signage is planned and available? (record AC TCP)
-
“Dial Before You Dig” has been obtained before commencing works?<br>(Record Sequence Number)
-
All identified underground assets have been identified and highlighted by a suitably qualified service locator?
-
Potholing has been used to confirm the location of all identified underground assets?
-
An accredited safety observer is available for all plant operating in and around overhead and underground electrical or other assets?
-
Where trenches are deeper than 1.5 metres are they benched, battered or shored?
-
Spoil is stockpiled greater than 1 metre from the edge & on the downslope of the excavation?
-
All excavations are adequately signposted?
-
Is there safe entry & exit points to the trench?
-
Excavations are adequately barricaded, protected when not occupied or being worked on?
-
Site housekeeping – general, amenities, facilities implemented & in good order?
-
Site protection & safe access / egress implemented?
-
Spoil, soil piles are being rehabilitation where they are onsite for long periods?
-
Appropriate erosion and sediment controls in place?
-
Pedestrian access around the work site is available and safe?
-
Any further comments
Confined Space Entry, Asbestos Removal review
-
Is a confined space entry currently being performed on this site?
-
Has a confined space entry permit been completed?
-
Gas monitor has been bump tested and is in current calibration?
-
Atmosphere is being constantly monitored whilst confined space is occupied?
-
A dedicated Standby Person is available at all times whilst the space is occupied?
-
Workers within the confined space are wearing a safety harness and are attached to a retrieval device at all times?
-
Is asbestos removal occurring at this site?<br>(Record asbestos removal permit date)
-
Appropriate PPE for asbestos removal is being worn by all workers removing ACM?
-
ACM being removed is being kept moist at all times?
-
Not more than 10M2 is being removed from the site?
-
Workers removing ACM have been appropriately trained?
-
No more than 100kg of ACM is being transported at any single time?
-
ACM once removed is double wrapped in plastic and not allowed to dry out before being transported?
-
All slurry and broken pieces of ACM is being removed from excavations?
-
Any further comments
General Site Safety review
-
If noisy plant or equipment operating is hearing protection in place?
-
Fuel containers (hydrocarbons) stored appropriately? (separate from other chemicals)
-
A dedicated refueling point has been establish with a spill kit available?
-
Safety Data Sheets available for all hazardous / dangerous chemicals?
-
Are there controls in place to prevent a worker falling from one level to another that is reasonably likely to cause an injury to that person (REG 78. 1 to 5)
-
Are workers advised of the risks of falls and the safe system of work required to prevent these fall when completing the site inductions?
-
Excavators / backhoes used for lifting / moving loads are fitted with burst protection?
-
Lifting slings, chains, straps appear to be in serviceable condition & in test date?
-
Fire extinguishers are readily available for hot work?
-
PPE is in good condition?<br>(Check hard hat expiry date)
-
Sun protection is implemented?
-
Excessive black exhaust smoke is not seen coming from plant?
-
Waste material has been removed from site / or appropriately stored prior to removal?
-
Observer is available for hot work?
-
Are work vehicles / plant not directly involved in work activities parked clear of public thoroughfares?
-
PPE applicable to work task and site requirements is being worn?
-
Are hand tools in good condition? (check some tools)
-
Site is adequately secured when unattended?
-
Communication to emergency services is available?
-
Are there adequate facilities for workers?<br>(Toilets, drinking water, shaded area for breaks)
-
Is the site being rehabilitated back to its original condition before work commenced?
-
Workers have adequate protection systems in place when they are working over or near water?
-
The risks of an object falling on a worker has been controlled
-
Any further comments
-
Worksite is generally kept clean and tidy?
Inspection review - sign-off
-
Has Inspection Form been reviewed with Team Leader onsite?
-
Team Leader Signature
-
Send completed WHS Site Inspection to WHS Co-Ordinator and Relevant Works Manager