Has contact been made with client representative confirming crew and required equipment arrive on time?
-
Have third party equipment been inspected for potential damage prior to loading or unloading operations?
-
Has JSA/SWMS been completed and signed by all relevant personnel?
-
Have additional hazards been identified and detailed within JSA/SWMS?
-
Does the JSA/SWMS cover all job steps, hazards and controls?
-
Are work crew members aware of their job role/functions?
-
Are all personnel wearing correct PPE for the task?
-
Is a lift study in place? And is it filled out correctly?
-
Has a pre-site inspection been completed?
-
Are isolations in place? Is the correct process being followed?
-
Is there a job card in place for the scope of work?
-
Has a vehicle pre start inspection been completed and any faults identified?
-
Required detail on docket and the required sign off in place?
-
Are load restraint requirements being complied with?
-
Rigging equipment is up to date with test and tag?
-
Pre-use inspections have been completed for rigging gear?
-
Rigging gear has been set up correctly and fit for purpose?
-
Crane and vehicles are clean - (Windows, cab, storage etc.)?
-
Positive behaviors observed? (Compliance to system(s) of work, use of appropriate PPE, Proactive risk management, working as a team, Liaise with customer) - Detail within notes
-
Opportunities for improvement? - Detail within notes