Information
-
Property inspection conducted on
-
Completed by
Ad Hoc Car Park Inspection
-
Commence New Car Park Inspection
Car Park Inspection
-
What type of car park is it ?
-
Select date
-
Add location
-
Car Park Number ?
-
In general how does the car park appear to be trading ?
-
Car Park Vacancy
Car Park Inspection Pay on Foot Car Park
-
A visual inspection has been completed of External light box and signage<br>Check cleanliness, operational, timer correct, all tubes lit, clear of graffiti no damage
-
A visual inspection has been completed to identify any graffiti ?
-
A visual inspection has been completed of the stairwells to identify any graffiti, lighting or cleaning issues
-
*Are there conditions of entry signage rates boards in place, are they correct? <br>operating hours showing correct closing times ?
-
Have all entries to under cover car parks implemented maximum height measures, (make notes if there are repairs / corrections required or if the height is no longer relevant due to internal changes)
-
Line Marking - line marking is clear and distinct. Including bay markings, pedestrian and directional arrows.
-
In your opinion what is the standard in terms of wear and tear of the existing line markings?
-
Are there any pot holes or surfaces that require repair? (If the answer is yes take photos of all identified)
-
Are all protective bollards and guard rails in place and fit for purpose?
-
*For car spaces opposite wall structures, are wheel stops in place and in correct repair
-
Are all lights within the car park working and the area is bright and easily visible?
-
Other observation or notes
-
Add media
Skidata Equipment (or other similar)
-
I have spent five minutes observing each of the car parks boom arms and they are functioning normally?
-
Machine Number and issue
-
*I have inspected all of the car parks APMs and they are functioning normally?
-
Machine Number and issue
-
*I have inspected the DAZ and it appears to be functioning correctly, the time is correct on the DAZ<br>I have inspected the CCTV computer and it appears to be functioning correctly and the time matches the DAZ
-
Other observations or notes?
-
Add media
Security / CCTV
-
Are there any undesirables present in the car park?
-
What were they doing at the time
-
Do they appear to have caused any damage or conducting illegal activities
-
Police Report Number ?
-
Comment on actions taken to move them on and result eg requested to move on by self refused contacted police Police report number xxxxxxxxxxxx Police arrested 3 persons
-
*I have inspected the CCTV cameras and computer.<br>All cameras are working and unobstructed and focused. The time on the computer matches the DAZ
-
Other observations or notes?
Lifts and Elevators
-
*I have inspected all lifts and at the time appear to function well i.e. door sensors, levelling and ride.
Staff Management - Spot Check
-
During the inspection are there any staff on Site ?
-
Is the staff member in uniform and well presented wearing id and safety vest
-
Staff Members Name and dress issues
-
Have they completed the sign-in register before commencing work?
-
In terms of WHS an observation of the staff member undertaking work on site would be best described as? -
-
What task was the staff member completing ?
-
Other observations or notes?
-
Add media
-
Select date
-
Add location
-
Car Park Number ?
Pay and Display Car Park Inspection
-
A visual inspection has been completed of External light box and signage<br>Check cleanliness, operational, timer correct, all tubes lit, clear of graffiti no damage
-
A visual inspection has been completed to identify any graffiti ?
-
A visual inspection has been completed to identify any loose or damaged tiles, brick work, cladding etc that presents a safety risk?
-
*Are there conditions of entry signage rates boards in place, are they correct? <br>operating hours showing correct closing times ?
-
Line Marking - line marking is clear and distinct. Including bay markings, pedestrian and directional arrows.
-
In your opinion what is the standard in terms of wear and tear of the existing line markings?
-
Are there any pot holes or surfaces that require repair? (If the answer is yes take photos of all identified)
-
Are all protective bollards and guard rails in place and fit for purpose?
-
*For car spaces opposite wall structures, are wheel stops in place and in correct repair
-
Are all lights within the car park working and the area is bright and easily visible?
-
Other observation or notes
-
Add media
Hectronic Equipment ( or other similar)
-
I have observed the operation of each machine in the car park and they are functioning normally?
-
Machine Number and issue
-
Other observations or notes?
-
Add media
Staff Management - Spot Check
-
During the inspection are there any staff on Site ?
-
Is the staff member in uniform and well presented wearing id and safety vest
-
Staff Members Name and dress issues
-
Have they completed the sign-in register before commencing work?
-
In terms of WHS an observation of the staff member undertaking work on site would be best described as? -
-
What task was the staff member completing ?
-
Other observations or notes?
-
Add media
Security
-
Are there any undesirables present in the car park?
-
What were they doing at the time
-
Do they appear to have caused any damage or conducting illegal activities
-
Police Report Number ?
-
Comment on actions taken to move them on and result eg requested to move on by self refused contacted police Police report number xxxxxxxxxxxx Police arrested 3 persons
General comments / other identified issues
-
Add media
-
Time at the completion of the inspection
-
Signature of WPA employee who completed the Ad Hoc Inspection