Final checks.
-
Have you gas tested for a minimum of five minutes?
-
Is the gas meter located to satisfy all clearance requirements?
-
Is there an LPG bottle set up on this property, and if so, have all clearances been met?
-
Mini Taps installed to all fixtures?
-
Fridge Tap installed with Washing Machine Tap?
-
Loxceal to be used on male thread only!
-
Has all tapware and toilets been fitted and free from scratches, dints or any other imperfection?
-
Has all excess silicone around base of toilets, basins and plug & washers been removed and cleaned to leave a neat finish?
-
Have all pan screws and guards been fitted?
-
Have all required holes been drilled for the dishwasher?
-
Does the sink waste have a nipple that the dishwasher can connect to?
-
Dishwasher installed level and tested?
-
Is the HWS installed and commissioned?
-
Have all valves been installed including Tempering Valve, Cold Water Expansion and Duo/NRV Valve
-
HWS positioned on approved base with overflow, PTR and Cold Water Expansion valves discharged over grate/tundish
-
All pipes and valves insulated with UV stable lagging including Cold Water Expansion, Tempering Valve and 500mm minimum cold water pipe to hot water unit
-
Have you tested and confirmed that there are no cross connections?
-
Have all fixtures been tested thoroughly and checked for leaks?
-
All pipe work that passes through cabinets & shelves have cover plates been installed to cover all holes?
-
Are all PVC pipes and plastic traps used for waste connections clean and free of excessive marks and dirt?
-
Is there a 500kpa boundary limiting valve fitted to the water meter?
-
Have the solar panels been installed and the flow and return lines connected?
-
Has the Boundary Riser Shaft been capped and concrete cover fitted at ground level?
-
Is the ORG charged correctly and at least 150mm below the lowest fixture and 75mm above finished ground level?
-
Where a boundary trap is installed, is there a multi vent fitted?
-
Is the boundary trap vent at least 3m away from an openable window?
-
Are the vents through the roof and complete with Dectite, Apron and Vent Cowl.
-
Has the stormwater overflow been fitted off with a finishing collar and flat grate at ground level?
-
Stormwater connected to kerb?
-
Are all downpipes and droppers completed with all clips installed?
-
Have all Hose Taps been fitted with Vacuum Breakers?
-
Have you checked the plans & job specifications for any extra inclusions?
-
Has all rubbish been picked up, placed in a bin provided and secured so it does not blow away?
-
Have all external windows and doors been locked?
-
Has the site been left in a safe state with all site fences closed?
-
Notes-
-
Add media
-
Is this job ready for the next stage?
-
I have checked all the above items and the work has been done to a satisfactory standard.