Information
-
Conducted on
-
Client / Site
-
Prepared by
-
WZTM Signage Inspection
LOCATION
-
Tap to enter information
WORK CREW MEMBERS
-
Tap to enter information
DOCUMENTATION
-
Have the signage record sheets been sighted and signed?
-
Has the Daily Toolbox Meeting Sheet been sighted?
SIGNAGE
-
Roadwork Ahead Sign
-
End Roadwork Sign
-
80 km/h Sign
-
150 - 250 mtr Buffer Zone
-
Slippery Surface Sign
-
40 km/h Sign
-
End 40 km/h Sign
-
50 mtr (No Work) Zone
-
40 km/h Repeater Signs every 1000 mtrs
-
50 mtr (No Work) Zone (exit)
-
End 40 km/h Sign (exit)
-
40 km/h Sign (exit)
-
Slippery Surface Sign (exit)
-
150 - 250 mtr Buffer Zone (exit)
-
80 km/h Sign (exit)
-
End Roadwork Sign (exit)
-
Roadwork Ahead Sign (exit)
-
"T" JUNCTION
-
50 mtr (No Work) Zone (exit)
-
End 40 km/h Sign (exit)
-
40 km/h Sign (exit)
-
Slippery Surface Sign (exit)
-
150 - 250 mtr Buffer Zone (exit)
-
80 km/h Sign (exit)
-
End Roadwork Sign (exit)
-
Roadwork Ahead Sign (exit)
SIGN CONDITION
-
Do any signs need to be replaced
-
SUPERVISOR
-
INSPECTOR'S SIGNATURE