Information

  • Location
  • Yarlington Fuel Switch Contract

  • Survey date

  • Prepared by

Property

  • Is there gas at the property and a meter in the box ?

  • Is there Adequate water pressures in property ?

  • Have you tested electrics with Socket and see ?

  • Does the property require a gas run for a cooker point ?

  • What is the type of property ?

  • How many bedrooms ?

  • How many bathrooms ?

  • If property is a flat which floor level is it on ?

  • Is scaffold required for any aspect of external works ?

  • Please take pics of elevation access points and ground

  • Is there Asbestos in property preventing works ?

Boiler

  • New Boiler location position ?

  • Do any units need moving for install ?

  • Please take a picture and advise customer it will need to be cleared

  • Condense internal or external ?

  • Is a condense strap on boss required

  • Is a condense pump required?

  • Please advise what type high temp if last resort

  • Is there a electric point for boiler spur ?

  • Is Frost protection or lagging required on instal ?

Flue options and External works

  • Flue type required?

  • Please record what is needed

  • Horizontal flue Does it require plumb kit or guard ?

  • Any bricks required ?if yes please get picture of colour

  • Any prv issues ?

  • If special prv / condensate pump is the only option please advise

  • If condensate external gully or soak away?

Heating system

  • If cylinder being removed is boiler going in to cylinder compartment

  • Ask tenant if they would like a small rad fitted

  • Lounge rad ,position ,size,?

  • Lounge 2 rad ,position ,size?

  • Kitchen rad ,position ,size ?

  • Dinning rad position ,size ,?

  • Hall 1 rad ,position ,size ?

  • Landing ,position, size ?

  • Bathroom 1 position ,size ?

  • Bathroom 2 position ,size,?

  • Bedroom 1 position ,size ?

  • Bedroom 2 position,size ?

  • Bedroom 3 position , size ?

  • Bedroom 4 position ,size,?

  • How many lengths of talon required for Drops

  • Total number of Lock shields and Trvs required

  • Are any building works required shelves or other

  • Please record what is required and take pictures

  • Add media

  • Any other relevant details for install?

  • Proposed installer

  • Proposed day of install

  • Surveyour

  • Tenant of property

  • Has the customer been informed of what is expected - furniture cleared verbally etc ?

  • Has the tenant been left a filled in copy of the install letter

  • Has customer been advised verbally to switch water heaters and economy 7 heaters off the night before ?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.