Information
-
Location
-
Yarlington Fuel Switch Contract
-
Survey date
-
Prepared by
Property
-
Is there gas at the property and a meter in the box ?
-
Is there Adequate water pressures in property ?
-
Have you tested electrics with Socket and see ?
-
Does the property require a gas run for a cooker point ?
-
What is the type of property ?
-
How many bedrooms ?
-
How many bathrooms ?
-
If property is a flat which floor level is it on ?
-
Is scaffold required for any aspect of external works ?
-
Please take pics of elevation access points and ground
-
Is there Asbestos in property preventing works ?
Boiler
-
New Boiler location position ?
-
Do any units need moving for install ?
-
Please take a picture and advise customer it will need to be cleared
-
Condense internal or external ?
-
Is a condense strap on boss required
-
Is a condense pump required?
-
Please advise what type high temp if last resort
-
Is there a electric point for boiler spur ?
-
Is Frost protection or lagging required on instal ?
Flue options and External works
-
Flue type required?
-
Please record what is needed
-
Horizontal flue Does it require plumb kit or guard ?
-
Any bricks required ?if yes please get picture of colour
-
Any prv issues ?
-
If special prv / condensate pump is the only option please advise
-
If condensate external gully or soak away?
Heating system
-
If cylinder being removed is boiler going in to cylinder compartment
-
Ask tenant if they would like a small rad fitted
-
Lounge rad ,position ,size,?
-
Lounge 2 rad ,position ,size?
-
Kitchen rad ,position ,size ?
-
Dinning rad position ,size ,?
-
Hall 1 rad ,position ,size ?
-
Landing ,position, size ?
-
Bathroom 1 position ,size ?
-
Bathroom 2 position ,size,?
-
Bedroom 1 position ,size ?
-
Bedroom 2 position,size ?
-
Bedroom 3 position , size ?
-
Bedroom 4 position ,size,?
-
How many lengths of talon required for Drops
-
Total number of Lock shields and Trvs required
-
Are any building works required shelves or other
-
Please record what is required and take pictures
-
Add media
-
Any other relevant details for install?
-
Proposed installer
-
Proposed day of install
-
Surveyour
-
Tenant of property
-
Has the customer been informed of what is expected - furniture cleared verbally etc ?
-
Has the tenant been left a filled in copy of the install letter
-
Has customer been advised verbally to switch water heaters and economy 7 heaters off the night before ?