Title Page
-
Manager Name
-
Depot
-
Conducted on
-
Prepared by
-
Location
Employee Details
-
All DHB related to your Job role must be read and signed. your Line manager will issue the designated DBH to you within the induction howevewr all Suttons Core DHB MUST be read and signed
Depot
-
Employee Number
-
Issue Date
Core 1
-
Introduction
Core 2
-
Safety, Health, Environment & Security
Core 3
-
Transport Emergency Procedures
Core 4
-
Drivers General Terms of Reference
Core 5
-
Mobile Phone Policy
Core 6
-
Working Time Directive, Drivers Hours & Tachograph Rules
Core 7
-
Coupling & Uncoupling Procedures for Semi-Trailers
Core 8
-
General Use of LGVs
Core 9
-
Tractor Cab, platforms and Trailer Bed Access
Core 10
-
Work at Height Including Tanker Top Access
Core 11
-
Slow Speed Manoeuvres
Core 12
-
Refuelling of Vehicles
Core 13
-
Topping up with Adblue
Core 14
-
Dealing with Overheated Wheels and Tyre Fires
Core 15
-
Dealing with Roadside Breakdowns
Core 16
-
Livery wash of Vehicles
Core 17
-
Internal Wash at Third Party Facilities
Core 18
-
Manual Handling of Hoses, Valves and Couplings
Core 19
-
Use of Handtools
Core 20
-
Lone Working
Core 21
-
Slips, Trips and Falls
Core 22
-
Workplace Transport Hazards
Core 23
-
Noise at work
Core 24
-
Pre-delivery Checks
Core 25
-
Split Coupling & Uncoupling
Core 26
-
Use of PPE
Core 27
-
Documentation for Transport of Dangerous Goods
Core 28
-
EURO 6 Engine Regeneration
Core 29
-
Smith System
Core 31
-
Avoidance of Bridge Strikes
Core 32
-
Social Media Policy
Core 33.1
-
Yorkshire Water Contract - Loading of Vacuum Tankers
Core 33.2
-
Yorkshire Water Contract – Discharging of Vacuum Tankers from Fixed Pipework
Core 33.3.
-
Yorkshire Water Contract – Gravity Loading of Vacuum Tankers from Fixed Pipework
Core 33.4
-
Yorkshire Water Contract – Gravity Discharge of Vacuum Tankers from Fixed Pipework
Core 33.5
-
Yorkshire Water Contract – Transhipment of Vacuum Tankers
Core 33.7
-
Yorkshire Water Contract – General Terms of Reference
Core 33.8
-
Yorkshire Water Contract - Ryther WWTW Traffic Management Procedure
Core 33.9
-
Yorkshire Water Contract - Grange Lane WWTW Traffic Management Procedure
Core 33.10
-
Yorkshire Water Contract - Ellerbeck WWTW Traffic Management Procedure
Core 33.11
-
Yorkshire Water Contract - Bog Green Lane WWTW Traffic Management Procedure
Core 33.12
-
Yorkshire Water Contract - Great Smeaton Traffic Management Procedure
Core 33.13
-
Yorkshire Water Contract - East Barmby WWTW Traffic Management Procedure
Core 33.14
-
Yorkshire Water Contract - Lockton WWTW Traffic Management Procedure
Core 33.15
-
Yorkshire Water Contract – Swinton Masham WWTW Traffic Management Procedure
Core 33.16
-
Yorkshire Water Contract – Upper Denby WWTW Traffic Management Procedure
Core 33.17
-
Yorkshire Water Contract – Spinners Tank WWTW Traffic Management Procedure
Core 33.18
-
Yorkshire Water Contract – Sandy Lane WWTW Traffic Management Procedure
Document Delaration
-
I Agree that i have read and understand all Procedures stated.
Signature required
-
Signature
-
Name
-
Completion Date